Planning application details ref: 22460 Cavan CoCo

100%100% Complete (warning)

Planning Application: 22460 (Cavan CoCo)
File Number: 22460
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 16/11/2022 Decision Due Date: 07/08/2023
Validated Date: 16/11/2022 Invalidated Date:
Further Info Requested: 19/01/2023 Further Info Received: 13/06/2023
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 03/08/2023
Leave to Appeal: Appeal Date: 31/08/2023
Commenced Date: Submissions By: 17/07/2023

Applicant Details

Applicant name: Elgin Energy Services Ltd
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: to seek permission to renew the planning approval granted previously under planning application 16/443 for a solar farm project. The proposed development will consist of a solar PV farm with an export capacity of approximately 4.2MVA comprising photovoltaic panels on ground frames, an enclosed single storey building containing the ESB terminal station and switchgear apparatus, storage container, 4 no. single storey inverter stations, ducting and underground electrical cabling, perimeter fencing, 11 no. mounted CCTV cameras, provision of new access from R194 (and internal access tracks), and all associated site development and landscaping works. The planning application also seeks minor amendments to the dimensions of the approved substation and increase in the operational lifespan of the project from 25 years to 40 years. The proposed development site is located within the townland Carrickabane, Finnea, Co. Cavan approximately 4km to the south of Kilcogy and 1.5km from Lough Sheelin. Access to the site is proposed from the R194 which connects the towns of Granard and Ballyjamesduff. Significant further information and revised plans have been submitted.
Development Address: Carrickabane, Finnea, Co. Cavan
Architect Name: Location Key: CARRICKABANE, FINEA
Electoral Division: Planner:
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 03/08/2023 Manager Order: PL 104,052
Decision Type: Conditional Number of Conditions: 19
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 26/05/2029
Decision Description: to seek permission to renew the planning approval granted previously under planning application 16/443 for a solar farm project. The proposed development will consist of a solar PV farm with an export capacity of approximately 4.2MVA comprising photovoltaic panels on ground frames, an enclosed single storey building containing the ESB terminal station and switchgear apparatus, storage container, 4 no. single storey inverter stations, ducting and underground electrical cabling, perimeter fencing, 11 no. mounted CCTV cameras, provision of new access from R194 (and internal access tracks), and all associated site development and landscaping works. The planning application also seeks minor amendments to the dimensions of the approved substation and increase in the operational lifespan of the project from 25 years to 40 years. The proposed development site is located within the townland Carrickabane, Finnea, Co. Cavan approximately 4km to the south of Kilcogy and 1.5km from Lough Sheelin. Access to the site is proposed from the R194 which connects the towns of Granard and Ballyjamesduff. Significant further information and revised plans have been submitted.

Appeal Details


Appeal Details
Notification Date: 01/09/2023 BP Reference #: ABP-317916-23
Appeal Type: THIRD PARTY File Forward Date:
Submission Due Date: 28/09/2023 Submission Sent Date:
Appeal Decision: CONDITIONAL Decision Date: 27/05/2024
Withdrawn Date: Dismissed Date:
Reason: