Planning application details ref: 1274 Clare County Council

100%100% Complete (warning)

Planning Application: 1274 (Clare County Council )
File Number: 1274
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 10/02/2012 Decision Due Date: 23/01/2013
Validated Date: 10/02/2012 Invalidated Date:
Further Info Requested: 03/04/2012 Further Info Received: 20/11/2012
Withdrawn Date: Extend Date:
Decision Type: Refused Decision Date: 22/01/2013
Leave to Appeal: Appeal Date: 15/02/2013
Commenced Date: Submissions By:

Applicant Details

Applicant name: ESB Wind Development
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: for a 10 year Planning Permission for a Wind Farm Project at Moneypoint Generating Station. The development will consist of five wind turbines each having a rated electricity output of approximately 3,000 kilowatts, modification of the existing high voltage Electrical Transformer Station to house additional electrical equipment and an additional single-storey Control Building, two anemometer mastsand all associated site works, above and below ground. Each wind turbine will have an overall maximum dimension of 152 meters, comprising a tower 95 - 100 meters high, with a diameter of about 4 meters at the base, to which 3 blades of 52 - 55 meters length will be attached. An Environmental Impact Statement will be submitted to the Planning Authority with the Application.
Development Address: Carrowdotia North and, Carrowdotia South, Killimer, Co Clare
Architect Name: Location Key: CARROWDOTIA KILRUSH
Electoral Division: Planner: Fiona Murren
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments: EOT on FI up to and including 2 Jan 2013. BOX FILE

Decision

Decision Date: 22/01/2013 Manager Order: 67720
Decision Type: Refused Number of Conditions: 1
Grant Date: 12/12/2013 Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 11/12/2023
Decision Description: for a 10 year Planning Permission for a Wind Farm Project at Moneypoint Generating Station. The development will consist of five wind turbines each having a rated electricity output of approximately 3,000 kilowatts, modification of the existing high voltage Electrical Transformer Station to house additional electrical equipment and an additional single-storey Control Building, two anemometer mastsand all associated site works, above and below ground. Each wind turbine will have an overall maximum dimension of 152 meters, comprising a tower 95 - 100 meters high, with a diameter of about 4 meters at the base, to which 3 blades of 52 - 55 meters length will be attached. An Environmental Impact Statement will be submitted to the Planning Authority with the Application.

Appeal Details


Appeal Details
Notification Date: 19/02/2013 BP Reference #:
Appeal Type: APPLICANT File Forward Date:
Submission Due Date: 18/03/2013 Submission Sent Date:
Appeal Decision: CONDITIONAL Decision Date: 12/12/2013
Withdrawn Date: Dismissed Date:
Reason: