Planning Application: 15450 (Clare County Council )
File Number:
15450
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
02/07/2015
Decision Due Date:
26/08/2015
Validated Date:
02/07/2015
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
25/08/2015
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
05/08/2015
Applicant Details
Applicant name:
Shannon Airport Authority
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
for the refurbishment and localised reconfiguration of the existing Arrivals/Immigration Hall, Transit Lounge and Block A, Departure Gates areas within the Shannon Airport Terminal Building. All works are to take place 'Airside' ( past security checks) and comprise of the following : 1) Arrivals/Immigration Hall: The relocation of the existing 'European Arrivals Door', localised replacement of the existing cladding and curtain walling facade at ground and first floor levels and associated reconfiguration and refurbishment of the internal office and arrivals, immigration and baggage hall areas; 2) Transit Lounge: The reconfiguration and refurbishment of the existing internal public areas resulting in the generation of 46m2 of new airside retail space; 3) Block 'A' Departure gates 1-5: The localised replacement of the existing cladding and curtain walling facade at ground and first floor levels as well as the refurbishment of the internal public waiting and toilet areas, including all ancillary site and service works
Development Address:
Shannon Airport, Shannon, Co. Clare
Architect Name:
Location Key:
SHANNON
Electoral Division:
Planner:
Fiona Murren
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
25/08/2015
Manager Order:
70257
Decision Type:
Conditional
Number of Conditions:
1
Grant Date:
25/09/2015
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
24/09/2020
Decision Description:
for the refurbishment and localised reconfiguration of the existing Arrivals/Immigration Hall, Transit Lounge and Block A, Departure Gates areas within the Shannon Airport Terminal Building. All works are to take place 'Airside' ( past security checks) and comprise of the following : 1) Arrivals/Immigration Hall: The relocation of the existing 'European Arrivals Door', localised replacement of the existing cladding and curtain walling facade at ground and first floor levels and associated reconfiguration and refurbishment of the internal office and arrivals, immigration and baggage hall areas; 2) Transit Lounge: The reconfiguration and refurbishment of the existing internal public areas resulting in the generation of 46m2 of new airside retail space; 3) Block 'A' Departure gates 1-5: The localised replacement of the existing cladding and curtain walling facade at ground and first floor levels as well as the refurbishment of the internal public waiting and toilet areas, including all ancillary site and service works