Planning application details ref: 2560257 Clare County Council

100%100% Complete (warning)

Planning Application: 2560257 (Clare County Council )
File Number: 2560257
Application Type: PERMISSION Planning Status: APPEALED
Received Date: 08/05/2025 Decision Due Date: 02/07/2025
Validated Date: 08/05/2025 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Refused Decision Date: 02/07/2025
Leave to Appeal: Appeal Date: 28/07/2025
Commenced Date: Submissions By: 11/06/2025

Applicant Details

Applicant name: Moanmore Lower Green Energy Limited
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: for a renewable energy development in the townlands of Moanmore Lower, Moanmore South, Tullabrack, Tullabrack East and Gower South, Kilrush, Co Clare. The Development will include the: • erection of 3 no. wind turbines with an overall ground to blade tip height of 150m, with a rotor diameter of 136m and a hub height of 82m and a total generating capacity of 15MW, • construction of turbine hard stand areas and turbine foundations, • construction of new internal site access tracks and upgrade of existing site track, to include all associated site drainage, • construction of 1. no new site entrance along the turbine delivery route with access onto the adjoining local road network (L6132), • construction of 1 no. temporary construction compound with associated temporary site offices, parking areas and security fencing, • development of a site drainage network, • construction of 1 no. 38kV electrical substation with all associated electrical plant and equipment, security fencing, lightening protection, security cameras and gates, and all ancillary structures and works, • 1 no. permanent spoil storage area, • all wind farm internal cabling connecting the wind turbines to the electrical substation, • all works associated with the permanent connection of the wind farm to the national electricity grid comprising a 38kV underground cable in permanent cable ducts from the proposed, permanent, on-site substation and to the existing Tullabrack 110kV ESBN Substation, • 2 no. flood compensation areas, • vertical realignment of an existing crest curve on the L6132 local road in order to prevent grounding of abnormal load vehicles during delivery of turbine components, • ancillary forestry felling to facilitate construction and operation of the development, • construction of a blade transfer area off the L6132, • provision of 2 no. biodiversity enhancement areas, • upgrade of an existing site entrance onto the adjoining local road network (L2034) including the demolition of an existing wall and removal of hedgerow at the site entrance to facilitate abnormal load vehicles during delivery of turbine components and reconstruction of same wall and replanting of hedgerow, • Landscaping and all associated ancillary works. This application is seeking a ten year permission and a 40 year operational life from the date of commissioning of the wind farm. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS).
Development Address: Moanmore Lower, Moanmore South, Tullabrack, Tullabrack East and Gower South, Kilrush, Co. Clare
Architect Name: Location Key: Moanmore Lower & South Tullabrack
Electoral Division: Planner: John O Sullivan
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 02/07/2025 Manager Order: 85815
Decision Type: Refused Number of Conditions: 4
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date:
Decision Description: for a renewable energy development in the townlands of Moanmore Lower, Moanmore South, Tullabrack, Tullabrack East and Gower South, Kilrush, Co Clare. The Development will include the: • erection of 3 no. wind turbines with an overall ground to blade tip height of 150m, with a rotor diameter of 136m and a hub height of 82m and a total generating capacity of 15MW, • construction of turbine hard stand areas and turbine foundations, • construction of new internal site access tracks and upgrade of existing site track, to include all associated site drainage, • construction of 1. no new site entrance along the turbine delivery route with access onto the adjoining local road network (L6132), • construction of 1 no. temporary construction compound with associated temporary site offices, parking areas and security fencing, • development of a site drainage network, • construction of 1 no. 38kV electrical substation with all associated electrical plant and equipment, security fencing, lightening protection, security cameras and gates, and all ancillary structures and works, • 1 no. permanent spoil storage area, • all wind farm internal cabling connecting the wind turbines to the electrical substation, • all works associated with the permanent connection of the wind farm to the national electricity grid comprising a 38kV underground cable in permanent cable ducts from the proposed, permanent, on-site substation and to the existing Tullabrack 110kV ESBN Substation, • 2 no. flood compensation areas, • vertical realignment of an existing crest curve on the L6132 local road in order to prevent grounding of abnormal load vehicles during delivery of turbine components, • ancillary forestry felling to facilitate construction and operation of the development, • construction of a blade transfer area off the L6132, • provision of 2 no. biodiversity enhancement areas, • upgrade of an existing site entrance onto the adjoining local road network (L2034) including the demolition of an existing wall and removal of hedgerow at the site entrance to facilitate abnormal load vehicles during delivery of turbine components and reconstruction of same wall and replanting of hedgerow, • Landscaping and all associated ancillary works. This application is seeking a ten year permission and a 40 year operational life from the date of commissioning of the wind farm. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS).

Appeal Details


Appeal Details
Notification Date: 29/07/2025 BP Reference #: ACP-323152-25
Appeal Type: APPLICANT File Forward Date:
Submission Due Date: 25/08/2025 Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: