Planning Application: 1851455 (Donegal County Council )
File Number:
1851455
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
19/09/2018
Decision Due Date:
22/02/2019
Validated Date:
19/09/2018
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
08/11/2018
Decision Type:
Conditional
Decision Date:
22/02/2019
Leave to Appeal:
Appeal Date:
20/03/2019
Commenced Date:
Submissions By:
23/10/2018
Applicant Details
Applicant name:
PATRICK SWEENEY
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
CONSTRUCTION OF AN ACCESS TRACK & ASSOCIATED SITE WORKS INCLUDING DRAINAGE AND UNDERGROUND ELECTRICAL CABLES TO SERVE PERMITTED SINGLE WIND TURBINE (PLANNING REFERENCE 16/50297 & 11/40003 REFER)
Development Address:
GARRYMORE , KERRYKEEL , LETTERKENNY PO , CO. DONEGAL
Architect Name:
Location Key:
GARRYMORE
Electoral Division:
Milford
Planner:
None
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
22/02/2019
Manager Order:
2019PH0359
Decision Type:
Conditional
Number of Conditions:
11
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
03/07/2024
Decision Description:
CONSTRUCTION OF AN ACCESS TRACK & ASSOCIATED SITE WORKS INCLUDING DRAINAGE AND UNDERGROUND ELECTRICAL CABLES TO SERVE PERMITTED SINGLE WIND TURBINE (PLANNING REFERENCE 16/50297 & 11/40003 REFER)
DEVELOPMENT OF A 7.2 MW WINDFARM COMPRISING OF 8 NO. 900KW WIND TURBINES, WITH STEEL TOWERS AND COMPOSITE FIBRE ROTOR BLADES, OF HUB HEIGHT UP TO A MAXIMUM 55 METRES, A ROTOR DIAMETER OF UP TO MAXIMUM 44 METRES AND BASE TO BLADE TIP HEIGHT OF UP TO A MAXIMUM 77 METRES. THE DEVELOPMENT WILL ALSO INCLUDE WIND TURBINE TRANSFORMERS, A TURBINE HARDSTAND, NEW ACCESS ROADS 4.5 METRES IN WIDTH, STRENGTHENING AND WIDENING OF EXISTING ACCESS ROADS, DRAINAGE, A SUBSTATION CONTROL BUILDING WITH FENCED COMPOUND FOR ELECTRICAL EQUIPMENT, A 54 METRE HIGH METEOROLOGICAL MEASURING MAST, TEMPORARY QUARRY, UNDERGROUND COMMUNICATION AND POWER CABLES AND ALL ASSSOCIATED SITE WORKS AND ANCILLARY DEVELOPMENT
ERECTION OF A SINGLE 2.3 Mw WIND-TURBINE WITH HUB HEIGHT OF 64 METRES, A ROTOR DIAMETER OF 71 METRES AND BASE TO BLADE TIP HEIGHT OF 98.140 METRES. THE PROPOSED WIND TURBINE WILL ALSO INCLUDE A TURBINE HARDSTAND, A NEW ACCESS ROAD, DRAINAGE, UDERGROUND COMMUNICATION AND POWER CABLES AND ALL ASSOCIATED SITE WORKS AND ANCILLARY DEVELOPMENT.
DEVELOPMENT OF A 7.2 MW WINDFARM COMPRISING OF 8 NO. 900KW WIND TURBINES, WITH STEEL TOWERS AND COMPOSITE FIBRE ROTOR BLADES, OF HUB HEIGHT UP TO A MAXIMUM 55 METRES, A ROTOR DIAMETER OF UP TO MAXIMUM 44 METRES AND BASE TO BLADE TIP HEIGHT OF UP TO A MAXIMUM 77 METRES. THE DEVELOPMENT WILL ALSO INCLUDE WIND TURBINE TRANSFORMERS, A TURBINE HARDSTAND, NEW ACCESS ROADS 4.5 METRES IN WIDTH, STRENGTHENING AND WIDENING OF EXISTING ACCESS ROADS, DRAINAGE, A SUBSTATION CONTROL BUILDING WITH FENCED COMPOUND FOR ELECTRICAL EQUIPMENT, A 54 METRE HIGH METEOROLOGICAL MEASURING MAST, TEMPORARY QUARRY, UNDERGROUND COMMUNICATION AND POWER CABLES AND ALL ASSSOCIATED SITE WORKS AND ANCILLARY DEVELOPMENT