File Number: | 2051157 | ||
Application Type: | PERMISSION | Planning Status: | APPLICATION FINALISED |
Received Date: | 25/08/2020 | Decision Due Date: | 01/07/2021 |
Validated Date: | 25/08/2020 | Invalidated Date: | |
Further Info Requested: | 15/10/2020 | Further Info Received: | 16/02/2021 |
Withdrawn Date: | Extend Date: | ||
Decision Type: | Conditional | Decision Date: | 24/06/2021 |
Leave to Appeal: | Appeal Date: | 21/07/2021 | |
Commenced Date: | Submissions By: | 10/06/2021 |
Applicant Details |
|||
---|---|---|---|
Applicant name: | IRISH WATER | ||
Applicant Address: | |||
Phone Number: | Fax Number: | ||
Corresp. Address: |
Proposed Development |
|||
---|---|---|---|
Development Description: | 1)CONSTRUCTION OF A NEW WASTEWATER TREATMENT PLANT (WWTP) IN THE TOWNLAND OF TIRRODDY WITH ASSOCIATED AND ANCILLARY DEVELOPMENT WORKS INCLUDING INTERNAL ACCESS ROAD, INLET WORKS, WWTP PROCESS TANKS, SLUDGE STORAGE TANKS, CHEMICAL STORAGE TANKS, ANCILLARY TREATMENT UNITS, ADMINISTRATION & ESB SUB-STATION BUILDING, SLUDGE PRESS BUILDING, INTERNAL PUMPING STATIONS, SURFACE WATER ATTENUATION POND, 2.4M HIGH BOUNDARY FENCE AROUND THE PERIMITER OF THE WWTP WORKS, 1.2M FENCING AROUND THE SITE BOUNDARY, ENTRANCE VIA AN EXISTING COILLTE ROADWAY AND ENTRANCE ONTO L-5612-1 AND WIDENING AND STRENGHTENING OF L-5612-1 2)CONSTRUCTION OF APPROXIMATELY 1,590M OF TREATED EFFLUENT OUTFALL PIPELINE IN THE TOWNLANDS OF TIRRODDY AND BROWNKNOE, INCLUDING APPROXIMATELY 160M MARINE SECTION & OUTFALL DIFFUSER LOCATED IN LOUGH SWILLY3) CONSTRUCTION OF 1 NO. MAIN WASTEWATER PUMPING STATION AT RAMELTON IN THE TOWNLAND OF RAMELTON INCLUDING ALL ANCILLARY DEVELOPMENT WORKS, DEMOLITION OF EXISTING SINGLE-STOREY BUILDING, FLOOD PROTECTION MEASURES, BELOW GROUND STORAGE TANK & STRUCTURES, PUMP HOUSE BUILDING, ESB SUB-STATION UNIT, RUBBLE STONE PERIMITER WALLS, NEW ENTRANCE ONTO CASTLE STREET, RECONSTRUCTION OF AN EXISTING STONE BOUNDARY WALL APPROXIMATELY 15M LONG ALONg CASTLE STREET AND CONNECTION TO EXISTING STORM OUTFALLS 4)CONSTRUCTION OF 1 NO. MAIN WASTEWATER PUMPING STATION AT RATHMULLAN IN THE TOWNLAND OF RATHMULLAN & BALLYBOE INCLUDING ALL ANCILLARY DEVELOPMENT WORKS, FLOOD PROTECTION MEASURES, BELOW GROUND STORAGE TANK & STRUCTURES, PUMP HOUSE BUILDING, RUBBLE STONE PERIMETER WALLS, ESB SUB-STATION UNIT, DEMOLITION OF AN EXISTING SUBTERRANEAN MUNICIPAL SEPTIC TANK, NEW TURNING HAMMERHEAD AT THE END OF THE EXISTING TURNING CIRCLE AT ABBEY VIEW ESTATE, NEW ENTRANCE TO ABBEY VIEW ESTATE, TEMPORARY WORKING AREA DURING CONSTRUCTION AND CONNECTION TO EXISTING STORM OUTFALLS 5)CONSTRUCTION OF 1 NO. NETWORK WASTEWATER PUMPING STATION AT RATHMULLAN IN THE TOWNLAND OF RATHMULLAN & BALLYBOE INCLUDING ALL ANCILLARY DEVELOPMENT WORKS, FLOOD PROTECTION MEASURES, BELOW GROUND PUMPING STATION, STORAGE TANK & STRUCTURES, LOW-LEVEL CONTROL KIOSK, 7.6M HIGH ORNATE VENTILATION STACK, RUBBLE STONE PERIMETER WALLS, DEMOLITION OF AN EXISTING SUBTERRANEAN MUNICIPAL SEPTIC TANK, NEW ENTRANCE ONTO MAIN STREET, TEMPORARY WORKING AREA DURING CONSTRUCTION, TEMPORARY ENTRANCE ONTO MAIN STREET DURING CONSTRUCTION, RELOCATION AND UPGRADING OF EXISTING STORM DRAIN AND CONNECTION TO EXISTING STORM OUTFALL...... | ||
Development Address: | RAMELTON, MILFORD AND RATHMULLAN, CO DONEGAL | ||
Architect Name: | Location Key: | RAMELTON | |
Electoral Division: | Ramelton | Planner: | None |
Social Housing Exempt: | Plan Enforcement #: | ||
IPC Licence Required: | No | Waste Licence Required: | No |
Protected Structure: | No | Protected Structure #: | |
Development Name: |
Comments |
|||
---|---|---|---|
Significant Case Flag: | Yes | Comments: |
Decision |
|||
---|---|---|---|
Decision Date: | 24/06/2021 | Manager Order: | 2021PH1567 |
Decision Type: | Conditional | Number of Conditions: | 20 |
Grant Date: | Grant Managers Order #: | ||
Section 47 Apply?: | Part 5 Apply?: | ||
Expiry Date: | 11/04/2027 | ||
Decision Description: | 1)CONSTRUCTION OF A NEW WASTEWATER TREATMENT PLANT (WWTP) IN THE TOWNLAND OF TIRRODDY WITH ASSOCIATED AND ANCILLARY DEVELOPMENT WORKS INCLUDING INTERNAL ACCESS ROAD, INLET WORKS, WWTP PROCESS TANKS, SLUDGE STORAGE TANKS, CHEMICAL STORAGE TANKS, ANCILLARY TREATMENT UNITS, ADMINISTRATION & ESB SUB-STATION BUILDING, SLUDGE PRESS BUILDING, INTERNAL PUMPING STATIONS, SURFACE WATER ATTENUATION POND, 2.4M HIGH BOUNDARY FENCE AROUND THE PERIMITER OF THE WWTP WORKS, 1.2M FENCING AROUND THE SITE BOUNDARY, ENTRANCE VIA AN EXISTING COILLTE ROADWAY AND ENTRANCE ONTO L-5612-1 AND WIDENING AND STRENGHTENING OF L-5612-1 2)CONSTRUCTION OF APPROXIMATELY 1,590M OF TREATED EFFLUENT OUTFALL PIPELINE IN THE TOWNLANDS OF TIRRODDY AND BROWNKNOE, INCLUDING APPROXIMATELY 160M MARINE SECTION & OUTFALL DIFFUSER LOCATED IN LOUGH SWILLY3) CONSTRUCTION OF 1 NO. MAIN WASTEWATER PUMPING STATION AT RAMELTON IN THE TOWNLAND OF RAMELTON INCLUDING ALL ANCILLARY DEVELOPMENT WORKS, DEMOLITION OF EXISTING SINGLE-STOREY BUILDING, FLOOD PROTECTION MEASURES, BELOW GROUND STORAGE TANK & STRUCTURES, PUMP HOUSE BUILDING, ESB SUB-STATION UNIT, RUBBLE STONE PERIMITER WALLS, NEW ENTRANCE ONTO CASTLE STREET, RECONSTRUCTION OF AN EXISTING STONE BOUNDARY WALL APPROXIMATELY 15M LONG ALONg CASTLE STREET AND CONNECTION TO EXISTING STORM OUTFALLS 4)CONSTRUCTION OF 1 NO. MAIN WASTEWATER PUMPING STATION AT RATHMULLAN IN THE TOWNLAND OF RATHMULLAN & BALLYBOE INCLUDING ALL ANCILLARY DEVELOPMENT WORKS, FLOOD PROTECTION MEASURES, BELOW GROUND STORAGE TANK & STRUCTURES, PUMP HOUSE BUILDING, RUBBLE STONE PERIMETER WALLS, ESB SUB-STATION UNIT, DEMOLITION OF AN EXISTING SUBTERRANEAN MUNICIPAL SEPTIC TANK, NEW TURNING HAMMERHEAD AT THE END OF THE EXISTING TURNING CIRCLE AT ABBEY VIEW ESTATE, NEW ENTRANCE TO ABBEY VIEW ESTATE, TEMPORARY WORKING AREA DURING CONSTRUCTION AND CONNECTION TO EXISTING STORM OUTFALLS 5)CONSTRUCTION OF 1 NO. NETWORK WASTEWATER PUMPING STATION AT RATHMULLAN IN THE TOWNLAND OF RATHMULLAN & BALLYBOE INCLUDING ALL ANCILLARY DEVELOPMENT WORKS, FLOOD PROTECTION MEASURES, BELOW GROUND PUMPING STATION, STORAGE TANK & STRUCTURES, LOW-LEVEL CONTROL KIOSK, 7.6M HIGH ORNATE VENTILATION STACK, RUBBLE STONE PERIMETER WALLS, DEMOLITION OF AN EXISTING SUBTERRANEAN MUNICIPAL SEPTIC TANK, NEW ENTRANCE ONTO MAIN STREET, TEMPORARY WORKING AREA DURING CONSTRUCTION, TEMPORARY ENTRANCE ONTO MAIN STREET DURING CONSTRUCTION, RELOCATION AND UPGRADING OF EXISTING STORM DRAIN AND CONNECTION TO EXISTING STORM OUTFALL...... |
Appeal Details | |||
---|---|---|---|
Notification Date: | 23/07/2021 | BP Reference #: | ABP310900-21 |
Appeal Type: | THIRD PARTY | File Forward Date: | 31/08/2021 |
Submission Due Date: | 19/08/2021 | Submission Sent Date: | |
Appeal Decision: | CONDITIONAL | Decision Date: | 12/04/2022 |
Withdrawn Date: | Dismissed Date: | ||
Reason: |