Planning Application: 2151263 (Donegal County Council )
File Number:
2151263
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
24/06/2021
Decision Due Date:
18/08/2021
Validated Date:
24/06/2021
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Refused
Decision Date:
12/08/2021
Leave to Appeal:
Appeal Date:
07/09/2021
Commenced Date:
Submissions By:
28/07/2021
Applicant Details
Applicant name:
SHANNAGH WIND FARM LIMITED
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
40 YEAR PERMISSION FOR AN ADDITIONAL 1 NO. WIND TURBINE, TO THE EXISTING 3 NO. TURBINE WINDFARM CONSISTING OF CONSTRUCTION OF: (1) 1 NO. WIND TURBINE WITH A HUB HEIGHT OF UP TO 84 METRES AND AN OVERALL HEIGHT OF UP TO 125 METRES TO BLADE TIP, (2) 1 NO.CRANE HARDSTAND AREA LOCATED BESIDE THE TURBINE, (3) 1 NO. 20 kV SUBSTATION BUILDING WITH ASSOCIATED ELECTRICAL PLANT AND EQUIPMENT, (4) INTERNAL WIND FARM UNDERGROUND CABLING, (5) NEW SITE ACCESS TRACK, (6) INSTALLATION OF A DRAINAGE SYSTEM FOR THE PROPOSED HARD STAND AND ACCESS TRACK AREAS, (7) UNDERGROUND GRID CONNECTION OF APPROXIMATELY 910 METRES IN LENGTH, PREDOMINANTLY ALONG THE EXISTING WIND FARM ACCESS ROAD NETWORK AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS IN THE TOWNLANDS
Development Address:
SHANNAGH & COGUISH, KILCAR
Architect Name:
Location Key:
SHANNAGH
Electoral Division:
Kilcar
Planner:
None
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
12/08/2021
Manager Order:
2021PH2053
Decision Type:
Refused
Number of Conditions:
2
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
25/01/2032
Decision Description:
40 YEAR PERMISSION FOR AN ADDITIONAL 1 NO. WIND TURBINE, TO THE EXISTING 3 NO. TURBINE WINDFARM CONSISTING OF CONSTRUCTION OF: (1) 1 NO. WIND TURBINE WITH A HUB HEIGHT OF UP TO 84 METRES AND AN OVERALL HEIGHT OF UP TO 125 METRES TO BLADE TIP, (2) 1 NO.CRANE HARDSTAND AREA LOCATED BESIDE THE TURBINE, (3) 1 NO. 20 kV SUBSTATION BUILDING WITH ASSOCIATED ELECTRICAL PLANT AND EQUIPMENT, (4) INTERNAL WIND FARM UNDERGROUND CABLING, (5) NEW SITE ACCESS TRACK, (6) INSTALLATION OF A DRAINAGE SYSTEM FOR THE PROPOSED HARD STAND AND ACCESS TRACK AREAS, (7) UNDERGROUND GRID CONNECTION OF APPROXIMATELY 910 METRES IN LENGTH, PREDOMINANTLY ALONG THE EXISTING WIND FARM ACCESS ROAD NETWORK AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS IN THE TOWNLANDS
CONSTRUCTION OF 5 WIND TURBINES WITH A 40 METRE HUB HEIGHT AND 52 METRE ROTOR DIAMETER, ACCESS TRACKWAYS 4.5 METRES IN WIDTH, A 20KV SUBSTATION BUILDING, A METREOLOGICAL MAST 40 METRES IN HEIGHT AND ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF 3 WIND TURBINES WITH A 40 METER HUB HEIGHT AND 52 METER ROTOR DIAMETER, ACCESS TRACKWAYS 4.5METERS IN WIDTH, A20KV SUBSTATION BUILDING, A METEOROLOGICAL MEASURING MAST 40 METERS IN HEIGHT AND ASSOCIATED SITE DEVELOPMENT WORKS
No Environment Impact Assesments Associated with this Application