Planning Application: 191378 (Galway County Council )
File Number:
191378
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
04/09/2019
Decision Due Date:
29/10/2019
Validated Date:
04/09/2019
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
25/10/2019
Leave to Appeal:
Appeal Date:
26/11/2019
Commenced Date:
Submissions By:
08/10/2019
Applicant Details
Applicant name:
Cumhacht an Tigh Sholais Teoranta
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
consisting of the construction, operation and decommissioning of one 10m high telecommunication mast, including a small concrete foundation and the installation of underground ducting for power and communication cables to/from the electrical substation building for the wind turbine development. One number telecommunication antenna will be attached to the mast and a lighting conductor will also be attached to the mast. The antenna is required for the operation of the grid connection for the wind turbine granted under planning reference 2011/420 and this development will be decommissioned with the wind turbine
Development Address:
Ros an Mhíl (Rossaveel)
Architect Name:
Location Key:
ROSSAVEEL
Electoral Division:
Planner:
John O'Donnell
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
U
Comments:
Decision
Decision Date:
25/10/2019
Manager Order:
Decision Type:
Conditional
Number of Conditions:
8
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
24/03/2025
Decision Description:
consisting of the construction, operation and decommissioning of one 10m high telecommunication mast, including a small concrete foundation and the installation of underground ducting for power and communication cables to/from the electrical substation building for the wind turbine development. One number telecommunication antenna will be attached to the mast and a lighting conductor will also be attached to the mast. The antenna is required for the operation of the grid connection for the wind turbine granted under planning reference 2011/420 and this development will be decommissioned with the wind turbine