Planning Application: 001267 (Kildare County Council )
File Number:
001267
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
11/07/2000
Decision Due Date:
05/12/2000
Validated Date:
11/07/2000
Invalidated Date:
Further Info Requested:
08/09/2000
Further Info Received:
29/09/2000
Withdrawn Date:
Extend Date:
28/11/2000
Decision Type:
Conditional
Decision Date:
05/12/2000
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
Noel Heavey
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
demolition of existing mushroom tunnels and erection of 6 replacement tunnels, the part conversion of existing store for additional sanitary facilities, and the erection of a single storey steel framed roofed enclosure etc
Development Address:
Carbury Mushroom Complex, Drummin , Carbury
Architect Name:
Location Key:
Carbury
Electoral Division:
Planner:
Jim Johnston
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
Waste Licence Required:
Protected Structure:
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
05/12/2000
Manager Order:
15740
Decision Type:
Conditional
Number of Conditions:
5
Grant Date:
10/01/2001
Grant Managers Order #:
15740
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
09/01/2006
Decision Description:
demolition of existing mushroom tunnels and erection of 6 replacement tunnels, the part conversion of existing store for additional sanitary facilities, and the erection of a single storey steel framed roofed enclosure etc
(I) construction of a single storey mono-pitch roof staff training room (67.6 sqm) directly accessible from the wider Monaghan Mushrooms facility campus; and (ii) all ancillary site works necessary to facilitate the development,
the construction of a photovoltaic solar farm comprising of 54 no. table solar panel arrays erected on ground mounted galvanised steel frames/support structures located in the southeast corner of the existing mushroom, compost and farm facility. The solar panels will be arranged facing southward with a separation distance of 5 meters between rows. The development also includes (i) ducting and underground electrical cabling; (ii) 2m high perimeter fencing to the north and west site boundaries with associated access gate; (iii) and all ancillary works including landscaping and associated civil engineering works necessary to facilitate the development. The solar farm will provide electrical power to the existing facility
demolition of existing obsolete single storey packhouse facility and the construction of two storey new replacement storage/packhouse facility for mushroom product with ancillary office accommodation at first floor level
No Environment Impact Assesments Associated with this Application