development in order to improve the quality of this land for agricultural purposes. The proposal comprises the importation of 47,000 tonnes of soil and stones, to be spread on the site in three stages and over a period of between three and five years, the changing of the existing land levels as part of this process, the use of an existing entrance and driveway in connection with this development and the creation of a temporary haul/access road linking the existing driveway with the works area (including a truck turning area), along with the installation of a wheel-wash and a portable toilet, with chemical treatment of effluent, for the duration of these site operations
The importation of 47,000 tonnes of soil and stones, to be spread on the site in three stages and over a period of between three and five years, the changing of existing land levels as part of this process, the use of an existing entrance and driveway in connection with this development and the creation of a temporary haul/access road linking the existing driveway with the works area (including a truck turning area), along with the installation of a wheel-wash and a portable toilet, with chemical treatment of effluent, for the duration of these site operations
development in order to improve the quality of this land for agricultural purposes. The proposed development comprises the importation of 47,000 tonnes of soil and stones, to be spread on the site in three phases and over a period of between three and five years, the changing of the existing land levels on the subject site as part of this process, the creation of a temporary haul road linking the driveway (which is to be built under entrance arrangements which have already been authorised under planning permission Reg. 21/203) with the works area (including a truck turning facility), along with the installation of a wheel-wash and a portable toilet, with chemical treatment of effluent, for the duration of these site operations
No Environment Impact Assesments Associated with this Application