Planning Application: 07795 (Kildare County Council )
File Number:
07795
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
16/04/2007
Decision Due Date:
08/10/2007
Validated Date:
16/04/2007
Invalidated Date:
Further Info Requested:
08/06/2007
Further Info Received:
14/08/2007
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
08/10/2007
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
William Browne Sand & Gravel Ltd
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
a) Continuance of use of the existing sand and gravel pit (13.2 hectares) on lands that have been used for this purpose since before 1st October 1964 on a site registered under Section 261 of the Planning and Development Act 2000 etc
Development Address:
Usk Townsland, Co. Kildare
Architect Name:
Tim Paul
Location Key:
Dunlavin
Electoral Division:
Planner:
Damian Daly
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
08/10/2007
Manager Order:
30318
Decision Type:
Conditional
Number of Conditions:
21
Grant Date:
01/02/2008
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
31/01/2013
Decision Description:
a) Continuance of use of the existing sand and gravel pit (13.2 hectares) on lands that have been used for this purpose since before 1st October 1964 on a site registered under Section 261 of the Planning and Development Act 2000 etc
Backfilling of a former sand and gravel pit to its former ground level using approximately 1,240,000 tonnes of imported natural inert waste materials and/or suitable by-product materials, principally soil and stone generated by construction and development projects; Establishment and operation of an inert soil waste recovery facility to provide for the recovery through backfilling, of natural inert soil and stone waste; Installation of site infrastructure including site offices, staff welfare facilities, weighbridge (with dedicated office), wheelwash facility, hardstand areas, fuel storage tanks and site access roads; Use of an existing storage shed as a waste inspection and quarantine facility and for storage of plant and equipment; Separation of any intermixed construction and demolition waste (principally concrete, metal, timber, PVC pipes and plastic) inadvertently imported to site prior to removal off-site to authorized waste disposal or recovery facilities; Temporary stockpiling of imported topsoil pending re-use as cover material for the final restoration of the site; Restoration of the final backfilled landform to long-term grassland/agricultural use. The proposed development requires a waste licence from the Environmental Protection Agency. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority in connection with the application, for development. Revised by significant further information consisting of; Updated information in Environmental Impact Assessment Report (EIAR). Flood Risk Assessment. New on-site Wastewater Treatment System. Surface Water Management. Road Condition Survey, Road Safety Audit and Sightline Assessment. Invasive Species Management Plan