a) Construction of 2nr Juvenile grass playing pitches & 1nr Adult grass playing pitch on lands adjoining to the existing club grounds. b) Redistribution of existing soil within site to form a revised level site. Importation of additional inert soil and stones to raise site level by <1m over redistributed soil level within an area of 3.1ha. Haul access via temporary site works access onto existing road at Kilcullen Business Campus. c) Erection of an all-weather 30m x 15m training area with double sided ball wall with flood lights, the ball wall will be 5 metres high and 15 metres wide with a 5m high perimeter fence with 4nr 13m high lighting columns to all weather pitch. d) Community fitness walkway & cycleway with active travel connections to existing neighbouring active transport nodes to the northwest, east and southeast of the subject lands with associated public lighting. e) Alteration/extension of existing car parking to include additional coach and car parking bays. f) Bicycle parking along with site infrastructure works, landscaping works and all associated site development and facilitating works
No Environment Impact Assesments Associated with this Application