Planning Application: 13300018 (Kildare County Council )
File Number:
13300018
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
09/09/2013
Decision Due Date:
26/05/2014
Validated Date:
09/09/2013
Invalidated Date:
Further Info Requested:
01/11/2013
Further Info Received:
29/04/2014
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
26/05/2014
Leave to Appeal:
Appeal Date:
20/06/2014
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
Martin McEvoy
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
The development will consist of the demolition of existing structures on site and the development of a single level retail store with a gross floor area of c.3,575sq.m.with subsidiary alcohol sales, all external signage (including illuminated elevational and freestanding signage), ancillary administration offices, staff facilities, ancillary plant, ESB substation(c. 28.8sq.m) , 205 no. car parking spaces to be provided at grade and a service yard. The proposal also provides for cycle stands, recycling facilities, new site access arrangements, upgrades and realignments to the access road to Woodstock Industrial Estate and Upper William Street (N78) including signalised junction, the construction of a new 450mm storm water sewer along Upper William Street (N78) to Bennett’s Bridge and all ancillary landscaping( including pedestrian access points), site development works and site services
Development Address:
Woodstock South, Athy, Co Kildare
Architect Name:
James McConnell
Location Key:
WOODSTOCK SOUTH ATHY
Electoral Division:
Planner:
Elaine Donohoe
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
26/05/2014
Manager Order:
Decision Type:
Conditional
Number of Conditions:
57
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
27/11/2019
Decision Description:
The development will consist of the demolition of existing structures on site and the development of a single level retail store with a gross floor area of c.3,575sq.m.with subsidiary alcohol sales, all external signage (including illuminated elevational and freestanding signage), ancillary administration offices, staff facilities, ancillary plant, ESB substation(c. 28.8sq.m) , 205 no. car parking spaces to be provided at grade and a service yard. The proposal also provides for cycle stands, recycling facilities, new site access arrangements, upgrades and realignments to the access road to Woodstock Industrial Estate and Upper William Street (N78) including signalised junction, the construction of a new 450mm storm water sewer along Upper William Street (N78) to Bennett’s Bridge and all ancillary landscaping( including pedestrian access points), site development works and site services
a 10 year planning permission for development which will consist of: (1) The demolition of a portion of an existing barley intake building and storage building; (2) The construction of a new malting plant comprising: an energies building (400.5 sqm and 16.6 metres high); a kiln vessel (594 sqm and 10.8 metres high); a steeps building (496.6 sqm and 20.4 metres high); 2 No. germination vessels (830 sqm and 10.2 metres high); a 300 cubic metre process water tank (5.7 metres high); and ancillary overhead conveyors at 11.5 metres above ground level: (3) The construction of a wastewater balance tank (167.3 sqm and 5.7 metres high): (4) The construction of 3 No. combined heat and power units (228 sqm and 7.4 metres high): (5) The construction of a barley intake building (145.7 sqm and 18 metres high); (6) The construction of a heat recovery unit for the Boby Kiln to be located on top of the existing Boby Tower (162 sqm) to a height of 21.6 metres above ground level; (7) The construction of a filter enclosure (60.7 sqm and 14 metres high); (8) The construction of a malt screen housing (65 sqm and 18.0 metres high); (9) The construction of a malt outloading structure with overhead storage bins (174.3 sqm and 23 metres high) with associated overhead conveyors; (10) 2 No. buffer bins (50 sqm and 20.7 metres high); (11) The renovation of Plewman’s House and the construction of a 76sqm board room extension and a 310 sqm administration building extension; (12) The construction of a 29 No. space car park with disabled and electric charging spaces adjacent to Plewman’s House; (13) The construction of an access road, footpath and vehicle entrance from the Woodstock Industrial Estate road; (14) An upgraded surface water management system to include a new surface water attenuation pond; 1 No. surface water screen; 1 No. hydrodynamic grit separator; and 1 No. hydrocarbon interceptor; and (15) All other site development works including the provision of ancillary access roads, hardstands, conveyors and underground services required to facilitate the development. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the Planning Authority, for development
The construction of a malt production process building (Nordon Steeps Building) along the north eastern boundary of the site as a replacement of the existing building that has collapsed; a canopy and a 500cu. Mm. water storage tank
No Environment Impact Assesments Associated with this Application