Planning Application: 13427 (Kildare County Council )
File Number:
13427
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
31/05/2013
Decision Due Date:
05/09/2013
Validated Date:
31/05/2013
Invalidated Date:
Further Info Requested:
24/07/2013
Further Info Received:
09/08/2013
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
05/09/2013
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
Annemarie Dempsey and John Cross
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
The construction of a detached four bedroom, storey and a half style dwelling house, a domestic two car garage to include boiler room and storage, new connection to existing foul sewer, surface water will be directed to on-site "Anua" rainwater harvesting system and a geo-thermal heating system will be installed. The development will also include widening an existing agricultural gateway to provide entrance to new driveway, the provision of piers and gates set back from the public road and all associated site works
Development Address:
Downings North, Prosperous, Co. Kildare.
Architect Name:
Noeline Devaney
Location Key:
DOWNINGS NORTH PROSPEROUS
Electoral Division:
Planner:
Martin Ryan
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
05/09/2013
Manager Order:
37742
Decision Type:
Conditional
Number of Conditions:
23
Grant Date:
07/10/2013
Grant Managers Order #:
37742
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
06/10/2018
Decision Description:
The construction of a detached four bedroom, storey and a half style dwelling house, a domestic two car garage to include boiler room and storage, new connection to existing foul sewer, surface water will be directed to on-site "Anua" rainwater harvesting system and a geo-thermal heating system will be installed. The development will also include widening an existing agricultural gateway to provide entrance to new driveway, the provision of piers and gates set back from the public road and all associated site works