Demolition of 4 no. existing prefabricated classrooms, plant room / boiler house structure, and water tower (total floor area of proposed demolitions = 411.0 sqm), and the erection of a 3 no. classroom and ancillary spaces extension to side / western elevation, and a 1 no. classroom and ancillary space extension to side / eastern elevation ( total floor area of proposed extensions = 425.0 sqm ), of existing Main School Building ( floor area of existing Main School Building = 181.0 sqm), together with all associated site works. Revised by significant further information consisting of; development to include the retention of the 4 no. existing prefabricated classrooms and plant room / boiler house structure
the provision of a new temporary standalone pre-fabricated structure containing 1 No. classroom and sanitary facilities (floor area = 80.0sqm) to the front of the existing school building, together with all associated site works
No Environment Impact Assesments Associated with this Application