Planning Application: 15288 (Kildare County Council )
File Number:
15288
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
13/04/2015
Decision Due Date:
29/10/2015
Validated Date:
13/04/2015
Invalidated Date:
Further Info Requested:
05/06/2015
Further Info Received:
02/10/2015
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
29/10/2015
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
Caglin Limited
Applicant Address:
Phone Number:
Fax Number:
23922381
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
The use of 4018 sq.m. of an industrial building to use for the manufacture of high grade plastic granulate from farm plastics. A waste licence is required.
Development Address:
Unit 1 Gateway Business Park, Dublin Road, Gallows Hill, Athy
Architect Name:
Location Key:
ATHY
Electoral Division:
Planner:
Siobhan Stewart
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
29/10/2015
Manager Order:
DO3577
Decision Type:
Conditional
Number of Conditions:
41
Grant Date:
10/12/2015
Grant Managers Order #:
DO3577
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
09/12/2020
Decision Description:
The use of 4018 sq.m. of an industrial building to use for the manufacture of high grade plastic granulate from farm plastics. A waste licence is required.
Unit No. 1, Gateway Business Park, Gallows Hill, Dublin Road,
(I) A new single storey detached modular office unit and a new single storey detached sprinkler valve room, both located on the west side of, in front of the west elevation of the existing factory building. (ii) A single storey 30sqm pump house and a 6.5m high sprinkler tank both located to the south west of the site and (iii) All Associated site works. Revised by significant further information consisting of; change of use of the existing production factory to storage/warehousing with ancillary production and the provision of new waste water treatment system with tertiary sand filtered percolation area.
No Environment Impact Assesments Associated with this Application