Planning Application: 16210 (Kildare County Council )
File Number:
16210
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
07/03/2016
Decision Due Date:
01/05/2016
Validated Date:
07/03/2016
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Refused
Decision Date:
28/04/2016
Leave to Appeal:
Appeal Date:
24/05/2016
Commenced Date:
Submissions By:
10/04/2016
Applicant Details
Applicant name:
Julie Doyle
Applicant Address:
Phone Number:
Fax Number:
23922932
Corresp.
Address:
Fleshtown, Sallins, Co. Kildare.
Applicant Details
Proposed Development
Development Description:
For development which seeks to improve the quality of the land for agricultural purposes, comprising of works for the importation of 52,000 tonnes of soil and stones, to be spread on the land in three stages, over a period of between three and five years, the changing of the existing land levels as part of this process, the use of an existing entrance and driveway in connection with this development and the creation of a temporary haul/access road linking the existing driveway with the works area (including a truck turning area), along with the installation of a wheel-wash and a portable toilet, with chemical treatment of effluent, for the duration of these site operations
Development Address:
Fleshtown, Sallins, Co. Kildare.
Architect Name:
Larry Holton
Location Key:
FLESHTOWN SALLINS
Electoral Division:
Planner:
Fiona Breen
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
28/04/2016
Manager Order:
DO6198
Decision Type:
Refused
Number of Conditions:
2
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
Decision Description:
For development which seeks to improve the quality of the land for agricultural purposes, comprising of works for the importation of 52,000 tonnes of soil and stones, to be spread on the land in three stages, over a period of between three and five years, the changing of the existing land levels as part of this process, the use of an existing entrance and driveway in connection with this development and the creation of a temporary haul/access road linking the existing driveway with the works area (including a truck turning area), along with the installation of a wheel-wash and a portable toilet, with chemical treatment of effluent, for the duration of these site operations
development in order to improve the quality of this land for agricultural purposes. The proposal comprises the importation of 47,000 tonnes of soil and stones, to be spread on the site in three stages and over a period of between three and five years, the changing of the existing land levels as part of this process, the use of an existing entrance and driveway in connection with this development and the creation of a temporary haul/access road linking the existing driveway with the works area (including a truck turning area), along with the installation of a wheel-wash and a portable toilet, with chemical treatment of effluent, for the duration of these site operations
The importation of 47,000 tonnes of soil and stones, to be spread on the site in three stages and over a period of between three and five years, the changing of existing land levels as part of this process, the use of an existing entrance and driveway in connection with this development and the creation of a temporary haul/access road linking the existing driveway with the works area (including a truck turning area), along with the installation of a wheel-wash and a portable toilet, with chemical treatment of effluent, for the duration of these site operations
development in order to improve the quality of this land for agricultural purposes. The proposed development comprises the importation of 47,000 tonnes of soil and stones, to be spread on the site in three phases and over a period of between three and five years, the changing of the existing land levels on the subject site as part of this process, the creation of a temporary haul road linking the driveway (which is to be built under entrance arrangements which have already been authorised under planning permission Reg. 21/203) with the works area (including a truck turning facility), along with the installation of a wheel-wash and a portable toilet, with chemical treatment of effluent, for the duration of these site operations
No Environment Impact Assesments Associated with this Application