Planning application details ref: 181514 Kildare County Council

100%100% Complete (warning)

Planning Application: 181514 (Kildare County Council )
File Number: 181514
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 14/12/2018 Decision Due Date: 22/10/2019
Validated Date: 14/12/2018 Invalidated Date:
Further Info Requested: 15/02/2019 Further Info Received: 28/08/2019
Withdrawn Date: Extend Date:
Decision Type: Refused Decision Date: 22/10/2019
Leave to Appeal: Appeal Date: 18/11/2019
Commenced Date: Submissions By: 01/10/2019

Applicant Details

Applicant name: Bord na Móna Powergen Ltd. & ESB Wind Development Ltd.
Applicant Address:
Phone Number: Fax Number: 25158738 39 40 41
Corresp. Address:

Applicant Details


Proposed Development

Development Description: a ten year planning permission to develop a renewable energy development. The proposed renewable energy development will comprise of (a) the construction and operation of 2 areas of solar photovoltaic arrays mounted on metal frames over an area of approximately 200ha, and having a maximum overall height of 3 metres over ground level; (b) Internal solar farm underground cabling; (c) 2 no. temporary construction compounds; (d) recreation and amenity works, including looped walk (upgrade of existing tracks and provision of new tracks, car parking and vehicular access); (e) 1 no. Battery Storage compound; (f) upgrade of existing tracks and provision of new site access roads; (g) site drainage; (h) forestry felling and replanting; (i) permanent signage; and (j) all associated site development and ancillary works. The proposed renewable energy development will have an operational life of 35 years from the date of commissioning. The overall renewable energy project also includes the provision of a 110kV substation with associated electrical plant, welfare facilities, waste water holding tank, security fencing, upgrade of existing tracks and provision of new site access roads, 110kV overhead line grid connection cabling with associated angle lattice masts and supporting polesets and all ancillary works, which is subject to a separate planning application made directly to An Bord Pleanála in accordance with Section 182A of the Planning and Development Act 2000 (as amended). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been prepared in relation to the project and accompanies this planning application. Revised by significant further information consisting of; Further Information Response Report; Updated Environmental Impact Assessment Report and Appendices; Updated Natura Impact Statement; Amended Planning Application Drawings, showing; amended access/amenity track (relocated to accommodate Marsh Fritillary habitat), updated amenity signage, clarification of road sectional drawings, additional substation cross section drawing. Updated photomontage booklet
Development Address: Townlands of Drehid, Mulgeeth,, Ballynamullagh, Mucklon, Kilmurray (Carbury By),, Killyon and Timahoe East, Co. Kildare
Architect Name: Location Key: TIMAHOE EAST DONADEA
Electoral Division: Planner: Jane O'Reilly
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 22/10/2019 Manager Order: CE25940
Decision Type: Refused Number of Conditions: 1
Grant Date: Grant Managers Order #:
Section 47 Apply?: No Part 5 Apply?: No
Expiry Date: 28/07/2025
Decision Description: a ten year planning permission to develop a renewable energy development. The proposed renewable energy development will comprise of (a) the construction and operation of 2 areas of solar photovoltaic arrays mounted on metal frames over an area of approximately 200ha, and having a maximum overall height of 3 metres over ground level; (b) Internal solar farm underground cabling; (c) 2 no. temporary construction compounds; (d) recreation and amenity works, including looped walk (upgrade of existing tracks and provision of new tracks, car parking and vehicular access); (e) 1 no. Battery Storage compound; (f) upgrade of existing tracks and provision of new site access roads; (g) site drainage; (h) forestry felling and replanting; (i) permanent signage; and (j) all associated site development and ancillary works. The proposed renewable energy development will have an operational life of 35 years from the date of commissioning. The overall renewable energy project also includes the provision of a 110kV substation with associated electrical plant, welfare facilities, waste water holding tank, security fencing, upgrade of existing tracks and provision of new site access roads, 110kV overhead line grid connection cabling with associated angle lattice masts and supporting polesets and all ancillary works, which is subject to a separate planning application made directly to An Bord Pleanála in accordance with Section 182A of the Planning and Development Act 2000 (as amended). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been prepared in relation to the project and accompanies this planning application. Revised by significant further information consisting of; Further Information Response Report; Updated Environmental Impact Assessment Report and Appendices; Updated Natura Impact Statement; Amended Planning Application Drawings, showing; amended access/amenity track (relocated to accommodate Marsh Fritillary habitat), updated amenity signage, clarification of road sectional drawings, additional substation cross section drawing. Updated photomontage booklet

Appeal Details


Appeal Details
Notification Date: 21/11/2019 BP Reference #: 305953-19
Appeal Type: APPLICANT File Forward Date: 05/12/2019
Submission Due Date: 18/12/2019 Submission Sent Date: 09/12/2019
Appeal Decision: CONDITIONAL Decision Date: 29/07/2020
Withdrawn Date: Dismissed Date:
Reason: 16