Planning Application: 191097 (Kildare County Council )
File Number:
191097
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
03/10/2019
Decision Due Date:
27/11/2019
Validated Date:
03/10/2019
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Refused
Decision Date:
27/11/2019
Leave to Appeal:
Appeal Date:
02/01/2020
Commenced Date:
Submissions By:
06/11/2019
Applicant Details
Applicant name:
Kilsaran Concrete (trading as Kilsaran Build),
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
a new sand and gravel extraction development on an overall site of c.32.2 hectares and comprises: Extraction of sand and gravel with excavation (dry and wet workings) occurring within a c.17.2 ha active area (location to vary over the operational phase) and related mobile processing activities that includes crushing, washing and screening and all ancillary works, plant and structures (including closed circuit silt disposal lagoons); Stockpiling of overburden (topsoil, subsoil and waste), raw and finished aggregates (prior to processing on-site / transportation off-site); Staff facilities including prefabricated canteen facility and welfare facilities (located within an existing agricultural shed); Ancillary site works including hardstand areas, bunded and covered fuel tanks, weighbridge, wheelwash, and packaged waste water treatment system; Perimeter landscaped screening berms; A new vehicular access point onto the L8006 including boundary treatment and signage; Landscaping and full restoration of the site with the establishment of a terrestrial and freshwater wildlife habitat; and The proposed extraction operational period is for 12 years with 2 years to complete restoration (total duration sought 14 years). This application is accompanied by an Environmental Impact Assessment Report and Natura Impact Statement, all development
a new sand and gravel extraction development on an overall site of c.32.2 hectares and comprises: Extraction of sand and gravel with excavation (dry and wet workings) occurring within a c.17.2 ha active area (location to vary over the operational phase) and related mobile processing activities that includes crushing, washing and screening and all ancillary works, plant and structures (including closed circuit silt disposal lagoons); Stockpiling of overburden (topsoil, subsoil and waste), raw and finished aggregates (prior to processing on-site / transportation off-site); Staff facilities including prefabricated canteen facility and welfare facilities (located within an existing agricultural shed); Ancillary site works including hardstand areas, bunded and covered fuel tanks, weighbridge, wheelwash, and packaged waste water treatment system; Perimeter landscaped screening berms; A new vehicular access point onto the L8006 including boundary treatment and signage; Landscaping and full restoration of the site with the establishment of a terrestrial and freshwater wildlife habitat; and The proposed extraction operational period is for 12 years with 2 years to complete restoration (total duration sought 14 years). This application is accompanied by an Environmental Impact Assessment Report and Natura Impact Statement, all development