Planning application details ref: 191323 Kildare County Council

100%100% Complete (warning)

Planning Application: 191323 (Kildare County Council )
File Number: 191323
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 28/11/2019 Decision Due Date: 31/01/2020
Validated Date: 28/11/2019 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Refused Decision Date: 31/01/2020
Leave to Appeal: Appeal Date: 27/02/2020
Commenced Date: Submissions By: 10/01/2020

Applicant Details

Applicant name: Cloncant Renewable Energy Limited,
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: A 10-year planning permission with a 30-year operational life for development on a site area of 3.23 hectares in the townland of Ticknevin, Carbury, Co. Kildare. The development will consist of up to 1 (one) wind turbine with a tip height of up to 187 metres, and all associated foundations and hardstanding areas, 20 metres of new wind farm road, and all associated underground electrical and communications cabling. This single turbine application forms part of a larger wind farm development located within County Offaly and Kildare with a separate planning application being submitted to Offaly County Council concurrently. The overall development will consist of up to 9 turbines (8 in Offaly and 1 in Kildare) with a tip height of up to 187 metres, and all associated foundations and hardstanding areas, approximately 4,750 metres of new internal access roads, associated drainage and turning areas; upgrade of approximately 3,500 metres of the existing L50062 public road including upgrade of the existing bridge; a new bridge crossing of the Figile River to provide access between Turbine 3 and Turbine 4; a 2,950-metre recreation trail and all associated development to include gravel pathways, a footbridge across the Figile River, a parking area, signage, information boards and outdoor fitness equipment; an off-site electrical substation and a battery energy storage facility; all associated underground electrical and communications cabling to connect the turbines to the substation including approximately 1,550 metres along the R401 Regional Road, a spoil storage area; a permanent meteorological mast up to 110.5 metres high; 2 No. temporary construction compounds; 2 No. temporary blade adapter set-down areas within the wind farm site and at the junction of the R402 and R401 at Rathmore, Edenderry, Co. Offaly; turbine delivery route works including widening of the junction of the R420 and R402 at Ballina, Geashill, Co. Offaly and all associated site development works. This application is accompanied by an Environmental Impact Assessment Report and a Natura Impact Statement,
Development Address: Ticknevin,, Carbury,, Co. Kildare.
Architect Name: Malachy Walsh and Partners Location Key: TICKNEVIN CARBURY
Electoral Division: Planner: Gary Farrelly
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 31/01/2020 Manager Order: CE27494
Decision Type: Refused Number of Conditions: 3
Grant Date: 23/09/2020 Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 22/09/2025
Decision Description: A 10-year planning permission with a 30-year operational life for development on a site area of 3.23 hectares in the townland of Ticknevin, Carbury, Co. Kildare. The development will consist of up to 1 (one) wind turbine with a tip height of up to 187 metres, and all associated foundations and hardstanding areas, 20 metres of new wind farm road, and all associated underground electrical and communications cabling. This single turbine application forms part of a larger wind farm development located within County Offaly and Kildare with a separate planning application being submitted to Offaly County Council concurrently. The overall development will consist of up to 9 turbines (8 in Offaly and 1 in Kildare) with a tip height of up to 187 metres, and all associated foundations and hardstanding areas, approximately 4,750 metres of new internal access roads, associated drainage and turning areas; upgrade of approximately 3,500 metres of the existing L50062 public road including upgrade of the existing bridge; a new bridge crossing of the Figile River to provide access between Turbine 3 and Turbine 4; a 2,950-metre recreation trail and all associated development to include gravel pathways, a footbridge across the Figile River, a parking area, signage, information boards and outdoor fitness equipment; an off-site electrical substation and a battery energy storage facility; all associated underground electrical and communications cabling to connect the turbines to the substation including approximately 1,550 metres along the R401 Regional Road, a spoil storage area; a permanent meteorological mast up to 110.5 metres high; 2 No. temporary construction compounds; 2 No. temporary blade adapter set-down areas within the wind farm site and at the junction of the R402 and R401 at Rathmore, Edenderry, Co. Offaly; turbine delivery route works including widening of the junction of the R420 and R402 at Ballina, Geashill, Co. Offaly and all associated site development works. This application is accompanied by an Environmental Impact Assessment Report and a Natura Impact Statement,

Appeal Details


Appeal Details
Notification Date: 28/02/2022 BP Reference #: 306748-20
Appeal Type: APPLICANT File Forward Date: 10/03/2020
Submission Due Date: 26/03/2020 Submission Sent Date: 13/03/2020
Appeal Decision: CONDITIONAL Decision Date: 23/09/2020
Withdrawn Date: Dismissed Date:
Reason: