File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
08409 |
APPLICATION FINALISED |
PERMISSION |
C |
10/03/2008 Monday |
Tegral Holdings Ltd |
Srowland Athy Co. Kildare |
the construction of two manufacturing facilities on a 15.2 ha site including, (a) production facility building (c 24,500sq.m.,13 metres high)for the manufacture of fibre cement roof slates and the importation of slate and other roofing etc |
141021 |
APPLICATION FINALISED |
EXTENTION OF DURATION |
C |
01/12/2014 Monday |
Tegral Holdings Ltd., |
Srowland Athy Co. Kildare |
Extension of Duration of Planning Ref. No. 08/409 - the construction of two manufacturing facilities on a 15.2 ha site including, (a) production facility building (c 24,500sq.m.,13 metres high)for the manufacture of fibre cement roof slates and the importation of slate and other roofing etc |
17240 |
APPLICATION FINALISED |
PERMISSION |
C |
07/03/2017 Tuesday |
|
Bleach Townland, Upper William Street, Athy, |
the upgrade of part of the existing production building to include the following: (i) Removal of part of the first floor of the existing building (243sqm); (ii) Removal of part of the existing roof structure, cladding and associated structure (1448sqm); (iii) Erection of new structure within the production building (1448sqm) to cover the existing floor area and to allow for an increase in height within the facility to a maximum eaves height of 8.5m and a maximum ridge height of 10.5m and all associated site development works |
20472 |
APPLICATION FINALISED |
PERMISSION |
C |
11/05/2020 Monday |
Tegral Holdings Limited, |
Bleach Townland, Upper William Street, Athy, |
the demolition of existing two storey office building, total floor are 190sqm, with associated site clearance and all site development works |
21920 |
DEEMED WITHDRAWN |
PERMISSION |
|
24/06/2021 Thursday |
Etex Ireland Ltd., |
Bleach Townland Upper William Street Athy |
for the existing production building to include the following (i) removal of the existing covered canopy roof structure and cladding (328m2)and (ii) erection of a new structure (328m2) to allow for increased height to a maximum eves height of 6m and a maximum ridge height of 8m with associated site development works |
92301374 |
NEW APPLICATION |
PERMISSION |
|
20/11/1992 Friday |
Tegral Building |
Bleach Townland, Upper William Street, Athy |
Construction of canopy roof structure on the east side of exiting main stockshed building, within the factory complex |
99300014 |
DECISION MADE |
PERMISSION |
C |
16/04/1999 Friday |
George Robinson |
674 Ardreigh, Athy, Co Kildare |
to build extension to rear and alterations to existing dwelling |
99300016 |
DECISION MADE |
PERMISSION |
C |
22/04/1999 Thursday |
Tegral Metal Forming Ltd. |
Bleach Td. Athy Co. Kildare |
First floor extension to office building of existing factory premises |