Planning Application: 19895 (Kildare County Council )
File Number:
19895
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
07/08/2019
Decision Due Date:
01/10/2019
Validated Date:
07/08/2019
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
25/09/2019
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
10/09/2019
Applicant Details
Applicant name:
Belmullet Hospitality Group Ltd.,
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
(a) Internal restoration and redecoration to floors, walls, ceiling and joinery (including repair and renewal works) as required, within existing ground floor rooms of Carton House; (b) Removal of single storey modern non-original partitions and rendered walls relating to the internal lobby (as per Planning Reg. Ref. 91/441 ; An Bord Pleanála Ref. PL 9/5/88418) and its replacement with free standing columns and glazed walling system to create a new (single storey) lobby and bar area as part of existing Hotel [with associated new entrance through the Kitchen Courtyard into the reconfigured lobby (existing entrance to be retained)], to include extension of the lobby area (c. 90sqm) into part of former kitchen yard area; Removal of existing bonded gravel surface/gravel strip in courtyard and replacement with new surface; Removal of modern bar and associated services from former “Stewards Hall” and its relocation to the reconfigured lobby/bar area; Installation of a screen wall in existing opening in north (internal) elevation of east pavilion (separating current barista bar and lobby area); (c) Provision (reinstatement ) of door within existing previously infilled opening to the external courtyard; Remodelling (including reconfiguration of fittings and fixtures) of modern commercial kitchen to extend into present barista bar area (former scullery); Replace existing sash window (in room No. 5) relating to the loggia on southern elevation of Carton House with hardwood double doors; Reconfiguration of previously modified (rooms Nos. 23 and 24) to include new partition walls, creation of openings within non-original partition wall; Mechanical and electrical upgrade works in existing plant space (within roof space) and provision of 1 No. new vent (in line with roof profile) at roof level; Provision of removable (demountable) servery units within the “Ante Room/Lobby” (room No. 4); New and replacement light fittings to ground floor rooms where required; and all associated site development works at a site within Carton House Hotel and Golf Resort (relating to main house and bar/lobby areas on a site of c. 0.41 hectares). Carton House is a protected structure
Development Address:
Carton Demesne,, Maynooth,, Co. Kildare.
Architect Name:
Martin Spillane - MDO Architects
Location Key:
CARTON DEMESNE MAYNOOTH
Electoral Division:
Planner:
Jane O'Reilly
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
Yes
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
25/09/2019
Manager Order:
DO25506
Decision Type:
Conditional
Number of Conditions:
5
Grant Date:
01/11/2019
Grant Managers Order #:
DO25506
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
31/10/2024
Decision Description:
(a) Internal restoration and redecoration to floors, walls, ceiling and joinery (including repair and renewal works) as required, within existing ground floor rooms of Carton House; (b) Removal of single storey modern non-original partitions and rendered walls relating to the internal lobby (as per Planning Reg. Ref. 91/441 ; An Bord Pleanála Ref. PL 9/5/88418) and its replacement with free standing columns and glazed walling system to create a new (single storey) lobby and bar area as part of existing Hotel [with associated new entrance through the Kitchen Courtyard into the reconfigured lobby (existing entrance to be retained)], to include extension of the lobby area (c. 90sqm) into part of former kitchen yard area; Removal of existing bonded gravel surface/gravel strip in courtyard and replacement with new surface; Removal of modern bar and associated services from former “Stewards Hall” and its relocation to the reconfigured lobby/bar area; Installation of a screen wall in existing opening in north (internal) elevation of east pavilion (separating current barista bar and lobby area); (c) Provision (reinstatement ) of door within existing previously infilled opening to the external courtyard; Remodelling (including reconfiguration of fittings and fixtures) of modern commercial kitchen to extend into present barista bar area (former scullery); Replace existing sash window (in room No. 5) relating to the loggia on southern elevation of Carton House with hardwood double doors; Reconfiguration of previously modified (rooms Nos. 23 and 24) to include new partition walls, creation of openings within non-original partition walls; Mechanical and electrical upgrade works in existing plant space (within roof-space) and provision of 1 No. new vent (in line with roof profile) at roof level; Provision of removable (demountable) servery units within the “Ante Room/Lobby” (room No. 4); New and replacement light fittings to ground floor rooms where required; and all associated site development works at a site within Carton House Hotel and Golf Resort (relating to main house and bar/lobby areas on a site of c. 0.41 hectares). Carton House is a protected structure