File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
21564 |
WITHDRAWN |
PERMISSION |
|
26/04/2021 Monday |
Mondello Park Sports Limited, |
Mondello Park, Donore, Naas, |
decommissioning and removal of two No. existing sewage treatment systems and replacing same with the construction/installation of 2 No. new wastewater treatment systems and all associated development works |
22406 |
APPLICATION FINALISED |
PERMISSION |
C |
11/04/2022 Monday |
Mondello Park Sports Limited, |
Mondello Park, Donore, Naas, |
sought for the demolition of existing 4 Nos. portacabin structures, and their replacement with single two-storey modular structure to provide for reception area, briefing area and amenities including kitchenette, toilets and changing rooms on the ground floor, a command centre, and a covered roof area on the first floor associated with the racing school, a new wastewater treatment system and tertiary polishing filter, and associated site works |
221308 |
DECISION MADE |
PERMISSION |
C |
03/11/2022 Thursday |
|
Mondello Park, Donore, Naas, |
to decommission and replace existing underground foul effluent storage tanks with an on-site wastewater treatment system followed by tertiary treatment, and associated site works |
245 |
FURTHER INFORMATION |
PERMISSION |
|
09/01/2024 Tuesday |
Mondello Park Sports Limited |
Mondello Park Donore Naas |
for (1) refurbishment, recladding and extension to the existing museum in the form of a new mezzanine level to enhance viewing experience of vintage cars, racing exhibits and memorabilia, and lift; new reception area with provision for vehicle display area; and associated plant room and disabled toilet linked to the main museum building equating to 515sqm; (2) provision of a two storey hospitality building (882sqm) excluding external terrace) in matching cladding to refurbished museum, reception area, designated classroom, hospitality area, bar, corporate/dining area, toilets, kitchen, dry store and classroom at ground floor level with external display area within a landscaped area, and at first floor a recessed viewing terrace overlooking the paddock and circuit, hospitality area, meeting room, event office, toilets, plant and storage area; (3) provision of new pedestrian overbridge including lift for disabled access; and (4) provision of 2 no. new cycle racks, 4 no. Electric Vehicle recharging spaces, improvements to existing accesses through enhanced road signage, road markings, extended sightlines and associated site works |