Planning application details ref: 20639 Kildare County Council

100%100% Complete (warning)

Planning Application: 20639 (Kildare County Council )
File Number: 20639
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 22/06/2020 Decision Due Date: 18/04/2021
Validated Date: 22/06/2020 Invalidated Date:
Further Info Requested: 13/08/2020 Further Info Received: 22/02/2021
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 16/04/2021
Leave to Appeal: Appeal Date: 13/05/2021
Commenced Date: Submissions By: 28/03/2021

Applicant Details

Applicant name: Sancom Ltd.
Applicant Address:
Phone Number: Fax Number: 23945760
Corresp. Address:

Applicant Details


Proposed Development

Development Description: Material Recovery Facility at a worked out quarry site. The principal activity will involve the use of imported, uncontaminated soil and stone, sourced from construction sites, to backfill and restore the worked out quarry. Sancom Ltd intend on accepting a maximum of approximately 1.8 million tonnes of soil and stone material on-site for backfilling over the course of 10 to 25 years, depending on market demand for disposal services…It is proposed to carry out construction and demolition waste recovery activities on-site to include top-soil screening, sand and gravel washing, concrete crushing, associated aggregate production and garden waste composting. A maximum of 387,000 tonnes of construction and demolition related waste material will be accepted on-site per annum. The total area of the application site is 19.2 hectares inclusive of site access roads. The fill area is 13.65 hectares in size. The Construction and Demolition Material Recovery Area is 4.4 hectares in size. A waste Licence will be obtained for the proposed waste recovery activities under the Waste Management Act, as amended. An Environmental Impact Assessment report has been furnished alongside the Planning Application. As part of the Proposed Development it is proposed to construct a new site access road running south of the site to the L4015 Castledermot to Baltinglass Road and a new site entrance onto this road designed to appropriate standards. It is also proposed to install/develop the following on-site: a weighbridge, a wheel wash, a stockpile and sorting area, the appropriate material recovery plant and equipment, a waste inspection and quarantine area, surface water treatment infrastructure and external lighting. Existing plant, equipment, site infrastructure and settlement ponds situated on-site will be utilized for proposed site activities. A Bunded Fuel Storage area currently present on-site will be upgraded. Revised by Significant Further information which consists of the applicant Sancom Ltd. now propose accepting a maximum of 99,500 tonnes of waste material at the proposed facility per annum a 25 year project lifetime (72,000 tonnes for backfilling and 27,500 tonnes o C&D Waste for processing), rather than the 387,000 tonnes of waste material per annum over an anticipated 10 year project lifetime originally proposed. See Newspaper Notice for full details of proposed works at
Development Address: Graney West,, Castledermot,, Co. Kildare.
Architect Name: Declan Kehoe-Kehoe Architectural Location Key: CASTLEDERMOT
Electoral Division: Planner: Gary Farrelly
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: Yes
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 16/04/2021 Manager Order: CE33352
Decision Type: Conditional Number of Conditions: 20
Grant Date: 27/06/2023 Grant Managers Order #: CE33352
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 26/06/2028
Decision Description: Material Recovery Facility at a worked out quarry site. The principal activity will involve the use of imported, uncontaminated soil and stone, sourced from construction sites, to backfill and restore the worked out quarry. Sancom Ltd intend on accepting a maximum of approximately 1.8 million tonnes of soil and stone material on-site for backfilling over the course of 10 to 25 years, depending on market demand for disposal services…It is proposed to carry out construction and demolition waste recovery activities on-site to include top-soil screening, sand and gravel washing, concrete crushing, associated aggregate production and garden waste composting. A maximum of 387,000 tonnes of construction and demolition related waste material will be accepted on-site per annum. The total area of the application site is 19.2 hectares inclusive of site access roads. The fill area is 13.65 hectares in size. The Construction and Demolition Material Recovery Area is 4.4 hectares in size. A waste Licence will be obtained for the proposed waste recovery activities under the Waste Management Act, as amended. An Environmental Impact Assessment report has been furnished alongside the Planning Application. As part of the Proposed Development it is proposed to construct a new site access road running south of the site to the L4015 Castledermot to Baltinglass Road and a new site entrance onto this road designed to appropriate standards. It is also proposed to install/develop the following on-site: a weighbridge, a wheel wash, a stockpile and sorting area, the appropriate material recovery plant and equipment, a waste inspection and quarantine area, surface water treatment infrastructure and external lighting. Existing plant, equipment, site infrastructure and settlement ponds situated on-site will be utilized for proposed site activities. A Bunded Fuel Storage area currently present on-site will be upgraded. Revised by Significant Further information which consists of the applicant Sancom Ltd. now propose accepting a maximum of 99,500 tonnes of waste material at the proposed facility per annum a 25 year project lifetime (72,000 tonnes for backfilling and 27,500 tonnes o C&D Waste for processing), rather than the 387,000 tonnes of waste material per annum over an anticipated 10 year project lifetime originally proposed. See Newspaper Notice for full details of proposed works at

Appeal Details


Appeal Details
Notification Date: 18/05/2021 BP Reference #: 310216-21
Appeal Type: APPLICANT File Forward Date: 28/05/2021
Submission Due Date: 14/06/2021 Submission Sent Date: 09/06/2021
Appeal Decision: CONDITIONAL Decision Date: 27/06/2023
Withdrawn Date: Dismissed Date:
Reason: 7 Amend/Remove Conditions