Planning Application: 20745 (Kildare County Council )
File Number:
20745
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
14/07/2020
Decision Due Date:
07/09/2020
Validated Date:
14/07/2020
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
01/09/2020
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
17/08/2020
Applicant Details
Applicant name:
Grid System Services Ltd
Applicant Address:
Phone Number:
Fax Number:
23945857
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
the development of a new electrical substation and additional equipment in the existing ESB Kilteel 110kV Substation to facilitate the connection of the Porterstown Battery Storage Facility (Planning Ref 18/247) The total site area is 1.2 hectares. The new electrical substation will include 1 control building (GRP Containerised Substation), a 110kV transformer, surge arresters, instrument transformers, a 110kV busbar connecting to the ESB substation, a lightning mast and other electrical equipment to be installed on concrete support structures. Additional features will include palisade fencing, security gates, access tracks, external lighting, drainage, associated electrical cabling and ducting, CCTV security monitoring system, landscaping and all associated ancillary infrastructure. The additional equipment to be installed in the ESB substation to facilitate the connection of the new substation will include a 110kV busbar extension, a 110kV transformer bay, a 110kV coupler bay, a 110kV busbar connecting to the new substation, an interface kiosk, palisade fencing, a lightning mast and all associated ancillary infrastructure required for the connection
Development Address:
Porterstown,, Kill,, Co. Kildare.
Architect Name:
Shane Kiely
Location Key:
KILL
Electoral Division:
Planner:
John O'Hara
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
01/09/2020
Manager Order:
DO29937
Decision Type:
Conditional
Number of Conditions:
8
Grant Date:
05/10/2020
Grant Managers Order #:
DO29937
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
04/10/2025
Decision Description:
the development of a new electrical substation and additional equipment in the existing ESB Kilteel 110kV Substation to facilitate the connection of the Porterstown Battery Storage Facility (Planning Ref 18/247) The total site area is 1.2 hectares. The new electrical substation will include 1 control building (GRP Containerised Substation), a 110kV transformer, surge arresters, instrument transformers, a 110kV busbar connecting to the ESB substation, a lightning mast and other electrical equipment to be installed on concrete support structures. Additional features will include palisade fencing, security gates, access tracks, external lighting, drainage, associated electrical cabling and ducting, CCTV security monitoring system, landscaping and all associated ancillary infrastructure. The additional equipment to be installed in the ESB substation to facilitate the connection of the new substation will include a 110kV busbar extension, a 110kV transformer bay, a 110kV coupler bay, a 110kV busbar connecting to the new substation, an interface kiosk, palisade fencing, a lightning mast and all associated ancillary infrastructure required for the connection
development of a grid system services facility within a total site area of up to 1.95 hectares, to include 1no. TSO compound including 1no. single storey TSO electrical substation building and 1no. single storey customer substation, 1no. customer switchgear, electrical inverter /transformer station modules, containerised battery storage modules on concrete support structures, heating, ventilation and air conditioning units (HVAC units), access tracks and upgraded site entrance, associated electrical cabling and ducting, security gates, perimeter security fencing, CCTV security monitoring system, culverts and landscaping works and all associated ancillary infrastructure
For the development of an extension of the existing control building at ESB Kilteel 110kV and all associated ancillary infrastructure required for the project
for a second phase of the existing grid system services facility within the existing grid system services facility within the existing site area of c1.95 hectares, which was granted via reference number 18/247. The second phase will utilise all existing infrastructure, including the EirGrid gird connection infrastructure, site roads, 110kV substation, compounds, and all ancillary services. The proposed new works will consist of the installation and operation of battery energy units, including 1 no. customer switchgear container which will be connected to the national grid, via the existing infrastructure ,electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary infrastructure on land at
No Environment Impact Assesments Associated with this Application