Planning application details ref: 211256 Kildare County Council

100%100% Complete (warning)

Planning Application: 211256 (Kildare County Council )
File Number: 211256
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 02/09/2021 Decision Due Date: 23/03/2022
Validated Date: 02/09/2021 Invalidated Date:
Further Info Requested: 26/10/2021 Further Info Received: 24/02/2022
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 23/03/2022
Leave to Appeal: Appeal Date: 19/04/2022
Commenced Date: Submissions By: 09/03/2022

Applicant Details

Applicant name: Power Capital Renewable Energy Limited,
Applicant Address:
Phone Number: Fax Number: 24179424
Corresp. Address:

Applicant Details


Proposed Development

Development Description: application for a 10 year permission for development on lands in the townland of Griffinrath, Celbridge. The development will consist of the construction of a solar PV farm with an operational life of 35 years comprising approximately 75,984 No. photovoltaic panels on ground mounted frames within a site area of 44.21 hectares and associated ancillary development including 10 No. transformer stations, approximately 124 No. string-inverters, 1 No. onsite 38kV substation building, 1 No. 40ft storage container building, 7 No. CCTV security cameras mounted on 4 metre high poles and perimeter security fencing (2 metres high), the construction of an internal hardcore access road between the solar panels and the site access, localised improvements to an existing agricultural access from the adjoining L5065 road to facilitate construction and operational phase access and, the installation of a 38kV underground electricity cable from the onsite 38kV substation to the 110kV Griffinrath substation ca. 0.75km to the southeast. A Natura Impact Statement has been prepared in respect of the proposed development. Revised by Significant Further Information which consists of an Aviation Glint and Glare Assessment Report, an Archaeological Report ; an amended Noise and Vibration Impact Assessment; a Traffic Report; drawings of cable locations and trench reinstatement and road closures and road diversion routes; a Stage 1/2 Road Safety Audit; updated drawings of the existing and proposed entrance and the proposed compound and temporary set down area; and a risk assessment of the hazards associated with a fire in or near the solar arrays.
Development Address: Griffinrath,, Celbridge,, Co. Kildare.
Architect Name: Malone O'Regan Location Key: GRIFFINRATH CELBRIDGE
Electoral Division: Planner: Louise Murphy
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 23/03/2022 Manager Order: DO39514
Decision Type: Conditional Number of Conditions: 32
Grant Date: 08/08/2022 Grant Managers Order #: DO39514
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 07/08/2032
Decision Description: application for a 10 year permission for development on lands in the townland of Griffinrath, Celbridge. The development will consist of the construction of a solar PV farm with an operational life of 35 years comprising approximately 75,984 No. photovoltaic panels on ground mounted frames within a site area of 44.21 hectares and associated ancillary development including 10 No. transformer stations, approximately 124 No. string-inverters, 1 No. onsite 38kV substation building, 1 No. 40ft storage container building, 7 No. CCTV security cameras mounted on 4 metre high poles and perimeter security fencing (2 metres high), the construction of an internal hardcore access road between the solar panels and the site access, localised improvements to an existing agricultural access from the adjoining L5065 road to facilitate construction and operational phase access and, the installation of a 38kV underground electricity cable from the onsite 38kV substation to the 110kV Griffinrath substation ca. 0.75km to the southeast. A Natura Impact Statement has been prepared in respect of the proposed development. Revised by Significant Further Information which consists of an Aviation Glint and Glare Assessment Report, an Archaeological Report ; an amended Noise and Vibration Impact Assessment; a Traffic Report; drawings of cable locations and trench reinstatement and road closures and road diversion routes; a Stage 1/2 Road Safety Audit; updated drawings of the existing and proposed entrance and the proposed compound and temporary set down area; and a risk assessment of the hazards associated with a fire in or near the solar arrays.

Appeal Details


Appeal Details
Notification Date: 20/04/2022 BP Reference #: 313370-22
Appeal Type: APPLICANT File Forward Date: 28/04/2022
Submission Due Date: 17/05/2022 Submission Sent Date: 16/05/2022
Appeal Decision: WITHDRAWN Decision Date:
Withdrawn Date: 26/05/2022 Dismissed Date:
Reason: