Planning Application: 211371 (Kildare County Council )
File Number:
211371
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
24/09/2021
Decision Due Date:
25/05/2022
Validated Date:
24/09/2021
Invalidated Date:
Further Info Requested:
15/11/2021
Further Info Received:
28/04/2022
Withdrawn Date:
Extend Date:
Decision Type:
Refused
Decision Date:
24/05/2022
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
Island Stability Services
Applicant Address:
Phone Number:
Fax Number:
24179539
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
for a 10 year planning permission to develop a synchronous condenser grid support facility, which will connect to the adjoining ESB Dunnstown Electricity Substation in the townland of Dunnstown, Brannockstown, Naas, Co. Kildare. The proposed development will have a projected life span of 50 years. At the end of life the proposed development can either be decommissioned or refurbished to extend its life. The development is to be located within a site compound c. 1 ha. It will regulate reactive power on the electricity network and will consist of the following elements: a building (c. 540 sqm. c. 10 m High) to house equipment including a synchronous condenser with flywheel, lube oil skid, air compressor and pumps. Equipment to be located outside of the footprint of the building but within a fenced compound will include cooling equipment (c. 160 sqm., c. 3m High); 6 No. modular containers to house electrical and control equipment (total area of c. 195 sqm., c. 5m High); a step-up transformer, an auxiliary transformer, an external circuit breaker, electrical balance of plant, 1 No. firefighting water tank, above ground oil separator and collection pit, c. 100m of underground cabling ducts and cable to the adjoining ESB substation, balustrade boundary fencing, security entrance gate and CCTV, all other ancillary and miscellaneous site works to include; site clearance; site access, internal roads development of areas of hard standing and lay-down area. The proposed development will connect by underground cable to the Electricity Supply Board (ESB) 220kV substation adjoining the western boundary of the proposed development site. This underground cabling will not form a part of the transmission networks as defined in section 2(1) of the Electricity Regulation Act 1999. Revised by Significant Further Information which consists of revised application site boundary to incorporate revised access arrangements to site from public road
Development Address:
Dunnstown,, Brannockstown, , Naas,, Co. Kildare.
Architect Name:
PNG Energy Limited
Location Key:
DUNNSTOWN BRANNOCKSTOWN
Electoral Division:
Planner:
Fiona Breen
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
24/05/2022
Manager Order:
DO40445
Decision Type:
Refused
Number of Conditions:
1
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
Decision Description:
for a 10 year planning permission to develop a synchronous condenser grid support facility, which will connect to the adjoining ESB Dunnstown Electricity Substation in the townland of Dunnstown, Brannockstown, Naas, Co. Kildare. The proposed development will have a projected life span of 50 years. At the end of life the proposed development can either be decommissioned or refurbished to extend its life. The development is to be located within a site compound c. 1 ha. It will regulate reactive power on the electricity network and will consist of the following elements: a building (c. 540 sqm. c. 10 m High) to house equipment including a synchronous condenser with flywheel, lube oil skid, air compressor and pumps. Equipment to be located outside of the footprint of the building but within a fenced compound will include cooling equipment (c. 160 sqm., c. 3m High); 6 No. modular containers to house electrical and control equipment (total area of c. 195 sqm., c. 5m High); a step-up transformer, an auxiliary transformer, an external circuit breaker, electrical balance of plant, 1 No. firefighting water tank, above ground oil separator and collection pit, c. 100m of underground cabling ducts and cable to the adjoining ESB substation, balustrade boundary fencing, security entrance gate and CCTV, all other ancillary and miscellaneous site works to include; site clearance; site access, internal roads development of areas of hard standing and lay-down area. The proposed development will connect by underground cable to the Electricity Supply Board (ESB) 220kV substation adjoining the western boundary of the proposed development site. This underground cabling will not form a part of the transmission networks as defined in section 2(1) of the Electricity Regulation Act 1999. Revised by Significant Further Information which consists of revised application site boundary to incorporate revised access arrangements to site from public road
10 year planning permission to develop a synchronous condenser grid support facility, which will connect to the adjoining ESB Dunnstown Electricity Substation in the townland of Dunnstown, Brannockstown, Naas, Co. Kildare. The proposed development will have a projected life span of 50 years. At the end of life the proposed development can either be decommissioned or refurbished to extend its life. The development is to be located within a site compound c.1 ha. It will regulate reactive power on the electricity network and will consist of the following elements: a building (c. 540 sqm. c.12m high) to house equipment including a synchronous condenser with flywheel, lube oil skid, air compressor and pumps. Equipment to be located outside the footprint of the building but within a fenced compound will include cooling equipment (c. 160sqm., c.3m high); 6 No. modular containers to house electrical and control equipment (total area of c.195 sqm., c.5m high): a step-up transformer, an auxiliary transformer, an external circuit breaker, electrical balance of plant. 1 No. firefighting water tank, above ground oil separator and collection pit, c. 100m of underground cabling ducts and cable to the adjoining ESB substation, balustrade boundary fencing, security entrance gate and CCTV, all other ancillary and miscellaneous site works to include site clearance, site access, internal roads and development of areas of hard standing any lay-down area. The proposed development will connect by underground cable to the Electricity Supply Board (ESB) 220kV substation adjoining the western boundary of the proposed development site. This underground cabling will not form a part of the transmission networks as defined in Section 2(1) of the Electricity Regulation Act 1999
No Environment Impact Assesments Associated with this Application