Planning Application: 211444 (Kildare County Council )
File Number:
211444
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
07/10/2021
Decision Due Date:
18/05/2022
Validated Date:
07/10/2021
Invalidated Date:
Further Info Requested:
29/11/2021
Further Info Received:
21/04/2022
Withdrawn Date:
Extend Date:
Decision Type:
Refused
Decision Date:
18/05/2022
Leave to Appeal:
Appeal Date:
09/06/2022
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
Taghadoe Energy Limited
Applicant Address:
Phone Number:
Fax Number:
24179612
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
a Synchronous Compensator (Electricity Grid stabilisation) development within the townland of Windgates, Co. Kildare within a site area of approximately 1.97 hectares. Permission is sought for 1 High Intertia Synchronous Compensator (HISC) Compound (0.25 hectares) consisting of 1 No. High Intertia Synchronous Compensator (HISC) building enclosed within a steel clad framed, housed structure (12.1m max height and 481 m2) and supported by an electrical container area measuring 355m2 consisting of 8 No. electrical equipment containers with a total area of (238m2), each container measuring 29.75m2, and an external cooler area measuring 180m2 consisting of 4 No. external cooler units, each one measuring 30.5m2, 1 Auxiliary and Start up Static Frequency Converter SFC Transformer, 1 Generator circuit breaker, 1 emergency diesel generator and 1 associated diesel storage tank; A High Voltage (HV) Compound (0.11 hectares) consisting of main transformer and High Voltage (HV) equipment; A Gas Insulated Switchgear (GIS) Building compound and underground grid connection (0.25 hectares) consisting of 1 High Voltage Gas Insulated Switchgear Compound (0.16 Hectares), included within this compound is a HV Gas Insulated Switchgear (GIS) housed structure (13.5m max height and 458m2) and 220kv underground cable connection (188m in length) to adjacent (existing) 220kV Eirgrid Substation; Upgrade to the existing site entrance onto the R406, internal access tracks, fencing, temporary construction compound, landscaping and drainage. Planning permission is sought for a period of 10 years. A Natura Impact Statement (NIS) accompanies this application. All within the townland of
Development Address:
Windgates,, Co. Kildare.
Architect Name:
Fehily Timoney and Company
Location Key:
WINDGATES
Electoral Division:
Planner:
Louise Murphy
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
18/05/2022
Manager Order:
DO40374
Decision Type:
Refused
Number of Conditions:
1
Grant Date:
05/10/2023
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
04/10/2028
Decision Description:
a Synchronous Compensator (Electricity Grid stabilisation) development within the townland of Windgates, Co. Kildare within a site area of approximately 1.97 hectares. Permission is sought for 1 High Intertia Synchronous Compensator (HISC) Compound (0.25 hectares) consisting of 1 No. High Intertia Synchronous Compensator (HISC) building enclosed within a steel clad framed, housed structure (12.1m max height and 481 m2) and supported by an electrical container area measuring 355m2 consisting of 8 No. electrical equipment containers with a total area of (238m2), each container measuring 29.75m2, and an external cooler area measuring 180m2 consisting of 4 No. external cooler units, each one measuring 30.5m2, 1 Auxiliary and Start up Static Frequency Converter SFC Transformer, 1 Generator circuit breaker, 1 emergency diesel generator and 1 associated diesel storage tank; A High Voltage (HV) Compound (0.11 hectares) consisting of main transformer and High Voltage (HV) equipment; A Gas Insulated Switchgear (GIS) Building compound and underground grid connection (0.25 hectares) consisting of 1 High Voltage Gas Insulated Switchgear Compound (0.16 Hectares), included within this compound is a HV Gas Insulated Switchgear (GIS) housed structure (13.5m max height and 458m2) and 220kv underground cable connection (188m in length) to adjacent (existing) 220kV Eirgrid Substation; Upgrade to the existing site entrance onto the R406, internal access tracks, fencing, temporary construction compound, landscaping and drainage. Planning permission is sought for a period of 10 years. A Natura Impact Statement (NIS) accompanies this application. All within the townland of