Planning Application: 211518 (Kildare County Council )
File Number:
211518
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
21/10/2021
Decision Due Date:
15/12/2021
Validated Date:
21/10/2021
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
10/12/2021
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
24/11/2021
Applicant Details
Applicant name:
ESB
Applicant Address:
Phone Number:
Fax Number:
24179687
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
for reopening of a temporary vehicular access point at the location of a historic entrance onto Pfizer site, off the R445, to facilitate construction of the extension to the ESB Baroda 110kV Substation. The existing fence will be removed at the proposed entrance and replaced with a security gate. A temporary road will be constructed between the entrance the existing road within the site. The proposed works at the entrance will be reinstated to match the existing arrangement following completion of the works at the substation
Development Address:
R445, Littleconnell,, Newbridge,, Co. Kildare.
Architect Name:
Paddy Curran
Location Key:
NEWBRIDGE
Electoral Division:
Planner:
Oisín Boland
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
10/12/2021
Manager Order:
DO37033
Decision Type:
Conditional
Number of Conditions:
9
Grant Date:
24/01/2022
Grant Managers Order #:
DO37033
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
23/01/2027
Decision Description:
for reopening of a temporary vehicular access point at the location of a historic entrance onto Pfizer site, off the R445, to facilitate construction of the extension to the ESB Baroda 110kV Substation. The existing fence will be removed at the proposed entrance and replaced with a security gate. A temporary road will be constructed between the entrance the existing road within the site. The proposed works at the entrance will be reinstated to match the existing arrangement following completion of the works at the substation
The development will consist of (1) removing the existing security gates/internal fence on the North East boundary of the site on the R445 road and installing a 2.5m high weld-mesh boundary fence and low hedge across the entrance front to marry in with existing boundary finishing details (2) construct a 1.8m high berm behind the section of the boundary fence(3) remove company sign, road traffic lights and traffic island at the junction of the existing security entrance and alter road markings on the R445 road on both sides of the entrance and (4) carry out alterations to the existing internal ring road at the east area of the site including the construction of a new section of road and berms, together with all associated ancillary site works
No Environment Impact Assesments Associated with this Application