Planning application details ref: 211518 Kildare County Council

100%100% Complete (warning)

Planning Application: 211518 (Kildare County Council )
File Number: 211518
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 21/10/2021 Decision Due Date: 15/12/2021
Validated Date: 21/10/2021 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 10/12/2021
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By: 24/11/2021

Applicant Details

Applicant name: ESB
Applicant Address:
Phone Number: Fax Number: 24179687
Corresp. Address:

Applicant Details


Proposed Development

Development Description: for reopening of a temporary vehicular access point at the location of a historic entrance onto Pfizer site, off the R445, to facilitate construction of the extension to the ESB Baroda 110kV Substation. The existing fence will be removed at the proposed entrance and replaced with a security gate. A temporary road will be constructed between the entrance the existing road within the site. The proposed works at the entrance will be reinstated to match the existing arrangement following completion of the works at the substation
Development Address: R445, Littleconnell,, Newbridge,, Co. Kildare.
Architect Name: Paddy Curran Location Key: NEWBRIDGE
Electoral Division: Planner: Oisín Boland
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 10/12/2021 Manager Order: DO37033
Decision Type: Conditional Number of Conditions: 9
Grant Date: 24/01/2022 Grant Managers Order #: DO37033
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 23/01/2027
Decision Description: for reopening of a temporary vehicular access point at the location of a historic entrance onto Pfizer site, off the R445, to facilitate construction of the extension to the ESB Baroda 110kV Substation. The existing fence will be removed at the proposed entrance and replaced with a security gate. A temporary road will be constructed between the entrance the existing road within the site. The proposed works at the entrance will be reinstated to match the existing arrangement following completion of the works at the substation

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: