Planning Application: 221498 (Kildare County Council )
File Number:
221498
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
16/12/2022
Decision Due Date:
25/09/2023
Validated Date:
16/12/2022
Invalidated Date:
Further Info Requested:
17/02/2023
Further Info Received:
01/08/2023
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
20/09/2023
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
Balyna Hotel Ltd
Applicant Address:
Phone Number:
Fax Number:
24970525
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
for the construction of (i) 72 no. self-catering units in 3 no. three storey buildings (total gross floor area: c.8,575 sqm) comprising 54 no. 2 bedroom units (84sqm each) and 18 no. 3 bedroom units (98sqm each), (ii) a single storey multi-use recreational and amenity pavilion building (120sqm); (iii) 79 no. surface level car parking spaces and additional internal access roadway, (iv); the relocation of existing playground, (v) The re re-alignment of c.70m length of existing foul and surface water drainage, landscaping, 2 no. bicycles and bin stores (one including plant, switch room and substation; the second includes a store), and ancillary site development works including 2 no. underground attenuation tanks, SUDs features such as permeable paving, integrated tree pits and rain gardens, the omission of 14 no. existing car parking spaces) all on a c.1.92ha. site within the curtilage of Ballina (Ballyna) House, a protected structure at Moyvalley Hotel & Golf Resort, Balyna Estate, Moyvalley, Co Kildare. The proposed development will connect to existing engineering services and on-site utilities, access roads, hotel amenities, etc at Moyvalley Hotel & Golf Resort. An environmental impact assessment report and a natural impact statement have been prepared in respect of the proposed development
Development Address:
Moyvalley Hotel & Golf Resort, Balyna Estate, Moyvalley, Co Kildare
Architect Name:
Ben Thomas
Location Key:
BALLINA MOYVALLEY
Electoral Division:
Planner:
Caitriona Dockery
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
20/09/2023
Manager Order:
CE48922
Decision Type:
Conditional
Number of Conditions:
24
Grant Date:
06/11/2023
Grant Managers Order #:
CE48922
Section 47
Apply?:
No
Part 5
Apply?:
No
Expiry Date:
05/11/2028
Decision Description:
for the construction of (i) 72 no. self-catering units in 3 no. three storey buildings (total gross floor area: c.8,575 sqm) comprising 54 no. 2 bedroom units (84sqm each) and 18 no. 3 bedroom units (98sqm each), (ii) a single storey multi-use recreational and amenity pavilion building (120sqm); (iii) 79 no. surface level car parking spaces and additional internal access roadway, (iv); the relocation of existing playground, (v) The re re-alignment of c.70m length of existing foul and surface water drainage, landscaping, 2 no. bicycles and bin stores (one including plant, switch room and substation; the second includes a store), and ancillary site development works including 2 no. underground attenuation tanks, SUDs features such as permeable paving, integrated tree pits and rain gardens, the omission of 14 no. existing car parking spaces) all on a c.1.92ha. site within the curtilage of Ballina (Ballyna) House, a protected structure at Moyvalley Hotel & Golf Resort, Balyna Estate, Moyvalley, Co Kildare. The proposed development will connect to existing engineering services and on-site utilities, access roads, hotel amenities, etc at Moyvalley Hotel & Golf Resort. An environmental impact assessment report and a natural impact statement have been prepared in respect of the proposed development
mixed use development to consist of: the demolition of existing structures (comprising 3 no dwellings and 4 no agricultural barns); conservation and refurbishment works to Balyna Estate Chapel and features within its curtilage etc.
EXTENSION OF DURATION mixed use development to consist of: the demolition of existing structures (comprising 3 no dwellings and 4 no agricultural barns); conservation and refurbishment works to Balyna Estate Chapel and features within its curtilage etc.
the proposed development consists of retention of alterations and completion of works to previously permitted development granted under planning ref 03/5. The development to be retained and completed comprises i) Retention of alterations and additional floor area (706 sq.m additional floor area) to a two-storey hotel building with redesigned foyer, reception, bar, restaurant, function room, service/ancillary areas, terraces, bedroom block, omission of previously permitted basement area and associated changes to the elevations. ii) Retention of internal revisions to Ballina (Ballyna) House (Protected Structure) including redesigned basement area to provide bar/lounge/toilets, extension of basement storage area to accommodate services and redesign of permitted Guest Lounges at 1st floor upper and lower levels to provide 2 no. additional guest bedrooms with ensuites; iii) Retention of internal and external revisions to 8 no. previously approved townhouses in blocks A, B, C & D (Protected Structures) to be used as self-catering tourist accommodation, v) Retention of change of use of Block G (Protected Strucutre) from previously permitted self catering apartment to use as hotel administration/office area, internal alterations to same and extension of original building to provide toilet facilites for this office space; vi) Retention of extension to the Function Room (Protected Structure) to provide toilet facilities; vii) Retention of alterations to permitted self-catering Courtyard Apartment Block (32 no. units) including alterations to permitted siting, relocation of car parking and ladscaping of courtyard; viii) Retention of 2 no. bin storage areas adjacent to Courtyard Apartment Block; ix) Retention of woodchip sotrage building, bin stroage areas and associated site works; x) Retention of revised entrance area/gates including a Gate Keepers Hut; xi) Retention and completion of modifications to previously approved on-site wastewater treatment system (extension of reed bed and percolation areas and new pump chamber) new access road to same from main access route on site and for additional upgrades to on-site services as well as all associated stie development workson a 10.4 hectare site