Planning Application: 221504 (Kildare County Council )
File Number:
221504
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
19/12/2022
Decision Due Date:
10/09/2023
Validated Date:
19/12/2022
Invalidated Date:
Further Info Requested:
21/02/2023
Further Info Received:
17/07/2023
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
08/09/2023
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
Aston Limited,
Applicant Address:
Phone Number:
Fax Number:
24970531
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
The development will consist of the provision of approximately 790m of new Distributor Road, including a new bridge over the River Liffey, forming part of the Newbridge South Outer Orbital Road (NSOOR) linking the Great Connell Road to the section of the NSOOR permitted under ABP Reg. Ref. 302141-18 (Belin Woods, currently under construction) and will comprise of the following works: Provision of a single carriageway road, with cycleways and footpaths in both directions, including a five-span bridge of approximately 170m over the River Liffey, with provision for future bus stops and associated toucan pedestrian crossing; Tie-in of the proposed section of Distributor Road with the Great Connell Road including upgrade of the existing roundabout to a signal control junction including toucan crossings on all arms of the junction; Provision of a proposed River Park of approximately 9.2 ha as a multi-use recreational amenity, including pedestrian and cycle routes connecting to existing public space network, a multi-use games area (MUGA) and incorporating biodiversity and water management features; Provision of 2 No. new agricultural entrances from the proposed Distributor Road to adjoining lands (pending any future residential development of those lands); and All associated earthworks, signage, lighting, drainage works, services and connections, landscaping works, environmental measures and all ancillary works above and below ground level. The application will be accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS)
Development Address:
Great Connell and Kilbelin,, Newbridge,, Co. Kildare.
Architect Name:
Punch Consulting Engineers
Location Key:
Great Connell, Newbridge
Electoral Division:
Planner:
Cliodhna Scanlon
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
08/09/2023
Manager Order:
CE48756
Decision Type:
Conditional
Number of Conditions:
42
Grant Date:
02/11/2023
Grant Managers Order #:
CE48756
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
01/11/2028
Decision Description:
The development will consist of the provision of approximately 790m of new Distributor Road, including a new bridge over the River Liffey, forming part of the Newbridge South Outer Orbital Road (NSOOR) linking the Great Connell Road to the section of the NSOOR permitted under ABP Reg. Ref. 302141-18 (Belin Woods, currently under construction) and will comprise of the following works: Provision of a single carriageway road, with cycleways and footpaths in both directions, including a five-span bridge of approximately 170m over the River Liffey, with provision for future bus stops and associated toucan pedestrian crossing; Tie-in of the proposed section of Distributor Road with the Great Connell Road including upgrade of the existing roundabout to a signal control junction including toucan crossings on all arms of the junction; Provision of a proposed River Park of approximately 9.2 ha as a multi-use recreational amenity, including pedestrian and cycle routes connecting to existing public space network, a multi-use games area (MUGA) and incorporating biodiversity and water management features; Provision of 2 No. new agricultural entrances from the proposed Distributor Road to adjoining lands (pending any future residential development of those lands); and All associated earthworks, signage, lighting, drainage works, services and connections, landscaping works, environmental measures and all ancillary works above and below ground level. The application will be accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS)
STRATEGIC HOUSING DEVELOPMENT (ABP DECISION) - demolition of existing site structures (2,622.3 sqm) and the construction of 569 no. residential units, a neighbourhood centre with 11 no. units (gross floor area 2,141 sqm) and a childcare facility (886 sqm), a circa 350 metre section of distributor road, and all ancillary and associated works on a site of 27.64 ha surrounding and including the dwellings of "Greatconnell" and "Valencia Lodge"