Planning application details ref: 22838 Kildare County Council

100%100% Complete (warning)

Planning Application: 22838 (Kildare County Council )
File Number: 22838
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 11/07/2022 Decision Due Date: 04/09/2022
Validated Date: 11/07/2022 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 30/08/2022
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By: 14/08/2022

Applicant Details

Applicant name: Orlego Ltd.
Applicant Address:
Phone Number: Fax Number: 23824746
Corresp. Address:

Applicant Details


Proposed Development

Development Description: the installation of a 76.26kWp Rooftop Solar Photovoltaic Array on the roof of an existing hotel complex, consisting of 246No. photovoltaic panels mounted directly on the roof surfaces, with associated inverters and electrical service connections; a Biomass Plant Room, with 250kW Boiler and Flue, and a Biomass Fuel Store; and a circa 93kWp Ground Mounted Solar Photovoltaic Array consisting of 300No. photovoltaic panels, located behind the hotel complex on its associated northern field, with all associated inverters, electrical/energy service connections, and all associated services and works
Development Address: Clanard Court Hotel,, Dublin Road,, Athy,, Co. Kildare.
Architect Name: Location Key: ATHY
Electoral Division: Planner: Neil Butler
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 30/08/2022 Manager Order: DO41976
Decision Type: Conditional Number of Conditions: 7
Grant Date: 21/10/2022 Grant Managers Order #: DO41976
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 20/10/2027
Decision Description: the installation of a 76.26kWp Rooftop Solar Photovoltaic Array on the roof of an existing hotel complex, consisting of 246No. photovoltaic panels mounted directly on the roof surfaces, with associated inverters and electrical service connections; a Biomass Plant Room, with 250kW Boiler and Flue, and a Biomass Fuel Store; and a circa 93kWp Ground Mounted Solar Photovoltaic Array consisting of 300No. photovoltaic panels, located behind the hotel complex on its associated northern field, with all associated inverters, electrical/energy service connections, and all associated services and works

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: