File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
001549 |
APPLICATION FINALISED |
PERMISSION |
C |
23/08/2000 Wednesday |
Barretstown Gang Camp Fund Ltd |
Barretstown Castle Barretstown Co. Kildare |
6 no. housing units similar in design and adjacent to the existing 9 housing units and the conversion of existing stable in the dining hall courtyard etc |
072374 |
APPLICATION FINALISED |
PERMISSION |
C |
10/10/2007 Wednesday |
Barretstown Gang Camp Fund Ltd |
Barretstown Castle Ballymore Eustace Co. Kildar |
demolition of an open barn and construction of a two storey multi purpose activity centre to accommodate camp activities as well as ancillary functions such as Barretstown Charity etc |
10708 |
APPLICATION FINALISED |
PERMISSION |
C |
13/07/2010 Tuesday |
Barretstown Gang Camp Fund Ltd |
Barretstown Castle Ballymore Eustace Co Kildare |
The development is similar in nature to that previously approved under reg ref. 07/2374, in providing for children’s camp activities and related charity events, and is located to the northwest of former stable buildings. The accommodation comprises a main sports / recreational hall with ancillary rooms, reception area, meeting rooms, stores and sanitary accommodation. The total gross floor area is 1,163sq.m. Associated site works include surface water soakways, connection to existing waste water treatment system and landscaping. Barrettstown Castle is a protected structure, and is listed as no. KD024-029 on the Sites and Monuments Record. |
11250 |
INCOMPLETED APPLICATION |
PERMISSION |
|
16/03/2011 Wednesday |
Barretstown Gang Camp Fund |
Barretstown Castle Ballymore Eustace Co. Kildare |
for development at Barretstown Castle, a Protected Structure, listed as no. KD024-029 on the Sites and Monuments Record. The proposal is for a 16.5sq.m single-storey extension to each of nine residential cottages, providing additional shower/toilet facilities only. The combined gross floor area is 148.5sq.m |
11551 |
APPLICATION FINALISED |
PERMISSION |
C |
31/05/2011 Tuesday |
Barretstown Gang Camp Fund Ltd. |
Barretstown Castle Ballymore Eustace, Co. Kildare |
16.5 sq.m. single storey extension to each of nine residential cottages, providing additional shower / toilet faciliteis only. The combined gross floor area is 148.5 sq.m. Barretstown Castle is a protected structure and is listed as no. KD024-029 on the Sites and Monuments Record |
12108 |
APPLICATION FINALISED |
PERMISSION |
C |
17/02/2012 Friday |
Barretstown Gang Camp Fund Ltd |
Barretstown Castle Ballymore Eustace Co Kildare |
The development is an amendment to previously approved sports/recreational hall and ancillary meeting rooms (reg. ref. 10/708), to provide a training room of 152sq.m. to the west elevation , and two new escape doors on the south elevation, of the main hall. Barrettstown Castle is a protected structure and listed as KD024-029 |
12139 |
APPLICATION FINALISED |
PERMISSION |
C |
17/02/2012 Friday |
Barretstown Gang Camp Fund Ltd. |
Barretstown Castle Ballymore Eustace Co. Kildare. |
Amendment to previously approved sports/recreational hall and ancillary meeting rooms (Reg. Ref. 10/708) to include the provision of changing rooms/showers of 42 sq m to the east elevation of the main hall, and the lowering of the sports hall roof by 2.65 m. This is a protected strusture and listed as KD024-029 on the Sites and Monuments Record, |
12140 |
APPLICATION FINALISED |
PERMISSION |
C |
17/02/2012 Friday |
Barretstown Gang Camp Fund Limited |
Barretstown Castle Ballymore Eustace Co. Kildare. |
The construction of 2 No. single storey residential cottages to the south-west of the castle, each 142 sq m in area and containing a dormitory, staff rooms and toilets. These cottages were previously approved under Reg. Ref. 93/742 but were not constructed. This is a protected sturcture and listed as KD024-029 on the Sites and Monuments Record, |
14110 |
INCOMPLETED APPLICATION |
PERMISSION |
|
18/02/2014 Tuesday |
Barretstown Gang Camp Fund Ltd. |
Barrettstown Castle Ballymore Eustace Co. Kildare |
The construction of a 48sq.m single storey lean – to “family room” extension to the west end of the existing 356 sq.m. internal horse riding ring, providing a waiting / viewing area for camp participants. Barretstown Castle is a protected structure, and is listed as KDO24-029 on the Sites and Monuments Record. |
14154 |
APPLICATION FINALISED |
PERMISSION |
C |
28/02/2014 Friday |
Barretstown Gang Camp Fund Ltd |
Barretstown Castle, Ballymore Eustace Co. Kildare |
construction of a 48 sqm single store lean-to extension to the west end of the existing 356 sq.m internal horse riding ring, providing a waiting/viewing area for camp participants |
15766 |
APPLICATION FINALISED |
PERMISSION |
C |
26/08/2015 Wednesday |
Barretstown Gang Camp Fund Limited |
Barretstown House Ballymore Eustace Co. Kildare. |
Construction of a new single storey stand-alone dining hall pavilion building with an area of 894 square metres to accommodate 250 diners. The building is raised on a suspended ground floor set on mini-piles above the existing ground and small pond and arranged around a new internal entrance courtyard which is formed around the existing trees. The roof is an exposed laminated timber lattice roof structure, with natural wood clad walls and glazed doors. The accommodation includes appropriate dining areas, servery areas, seating space, circulation areas, restrooms, kitchen, bin stores, stage area, external dining area and all related ancillary services and site works, all on an estate of approximately 210 hectares. Barretstown Castle is a National Monument RMP KD 024-029, |
171209 |
APPLICATION FINALISED |
PERMISSION |
C |
27/10/2017 Friday |
|
Barretstown Castle, Ballymore Eustace, Co. Kildare. |
the construction of a new three storey stand-alone volunteer’s accommodation lodge with a site area of 3542sqm and gross floor area of 975sqm to accommodate 82-88 bed spaces. Works include the demolition of a 1990’s disused dining hall (633sqm) and renovation works to the existing one storey courtyard buildings of 61sqm. The building height is 13.22 metres above FFL to the ridge height. The accommodation includes 22 bedrooms with ensuite bathrooms on all three floors, lounge and meeting areas at ground floor level and all related ancillary services and site works, all on an estate of approximately 210 hectares. The proposed development is in the curtilage of Barretstown House, RPS B24-27, and the attached Barretstown Castle, National Monument KD024-029, |
181009 |
APPLICATION FINALISED |
PERMISSION |
C |
17/08/2018 Friday |
Barretstown . |
Barretstown Castle Ballymore Eustace Co. Kildare |
amendments to the previously approved planning permission reference 17/1209, for the construction of a new three storey standalone volunteer’s accommodation lodge. The amendments include: The relocation of the south access stairs to the north and the adjustment of the lift location. The widening of the west fire escape stairs. Changes to elevations, mix of materials and adjustment of eaves detail. The modification of the roof profile. The site area of the development is 3542sqm and gross floor area is 982.94sqm to accommodate 82-88 bed spaces. The building height is 13.22 metres above FFL to the ridge height. The accommodation includes 22 bedrooms with ensuite bathrooms on all three floors, lounge and meeting areas at ground floor level and all related ancillary services and site works, all on an estate of approximately 210 hectares. The proposed development is in the curtilage of Barretstown House, RPS B24-27, and the attached Barretstown Castle, National Monument KD024-029 |
181337 |
APPLICATION FINALISED |
PERMISSION |
C |
06/11/2018 Tuesday |
|
Barretstown, Barretstown Castle, Ballymore Eustace, Co.Kildare, Ireland, |
The construction of a new canopy to cover an existing amphitheatre with associated access improvements to the existing amphitheatre including lighting of pathways and below new canopy structure. The site area is 0.1124 hectares. The canopy structure is 10.5 metres above the FFL to the top of build. The proposed application is within 75 metres of Barretstown House, RPS B24-27 and is also associated with Barretstown Castle, National Monument KD024-029. The site location is towards the central north west of the site curtilage, set within a wooded area, |
20818 |
APPLICATION FINALISED |
RETENTION |
C |
27/07/2020 Monday |
Barretstown Gang CampFund Mairead Forristal (Company Secretary), |
Barretstown Castle, Barretsown, Ballymore Eustace, |
of existing single story detached log cabin style structure used as a Sensory Room ancillary to the activities carried out at Barretstown and all associated site works. The development is within the curtilage of Barretstown House RPS B24-27 and is also associated with Barretstown Castle, National Monument KD 024-029 |
201599 |
APPLICATION FINALISED |
PERMISSION |
C |
22/12/2020 Tuesday |
Barretstown, |
Barretstown Castle, Ballymore Eustace, Co. Kildare. |
the material change of use and refurbishment of an existing courtyard accommodation block from camp accommodation to 2 No. new film and recording studios of 364sqm in area. The proposed development is located at Barretstown Castle, Ballymore Eustace. The existing building comprises 6 No. bedrooms, 1 No. nurses's station, 1 No. toilets and shower area. The proposed change of use and refurbishment works are to include: New performers' green room. 2 new recording studios and control room. The addition of some decorative cladding panels. Enlargement of an existing external door opening and new sliding door. 2 No. new operable canopy umbrellas for outdoor performances. All related ancillary services and site works on a site area of 403sqm. The refurbishment is located on an estate of approximately 210 hectares. The proposed development is located in the curtilage of Barretstown House, RPS B24-27, and the attached Barretstown Castle, National Monument KD024-029 |
221387 |
APPLICATION FINALISED |
PERMISSION |
C |
22/11/2022 Tuesday |
|
Barretstown Castle, Ballymore Eustace, Co. Kildare |
the demolition of an existing agricultural shed (c. 1003.80 sq. m. GFA) and the construction of a new one to three-storey stand-alone staff accommodation building (c. 1420.20 sq. m. GFA). The accommodation includes 45 No. ensuite bedrooms (consisting of 15 twin rooms and 30 single rooms providing a total of 60 No. bedspaces), on all three floors. Provision of a lounge area, gym, kitchen and dining area, laundry room, bin store, and plant/storage areas at ground floor level. Car Parking, covered bicycle parking, solar panels, and all related ancillary landscaping, services, and site development works to facilitate the development. The proposed development is within the curtilage of Barretstown House, a protected structure: RPS B24-27, and Barretstown Castle, a Recorded Monument: KD024-029 |
97195 |
APPLICATION FINALISED |
PERMISSION |
C |
09/05/1997 Friday |
Barretstown Gang Camp |
Barretstown Camp, Barretstown, Co. Kildare |
add porches to 3 no house units (nos. 13, 14 and 15) and to rotate unit 15 through 90 C to previously approved plans (ref 93.742) |