(1) Proposed carton breaker extension. This is a single storey extension located to the west end of the south elevation of the main building with a floor area of 60sqm. (2) Change of use of the offices on the first floor of the existing welfare block to a canteen. The existing on site canteen to be removed as previously approved under Reg. Ref. 12/75. (3) Retention of previously approved debagger extension (Ref. Ref. 10/901). The original extension had a proposed floor area of 92sqm with 3 No. loading bays. The extension built, was reduced in size to 66sqm with 2 No. loading bays. (4) Proposed construction of a single storey office block with floor area of 112sqm. It is to be situated to the east of the main building in the car park previously approved under Reg. Ref. 12/75. Works to include minor alterations to car park layout to facilitate location of proposed office block. (5) Construction of the following single storey electrical rooms on site; a dairy transformer room – 16sqm; b.MV substation – 63sqm. All electrical rooms will comply with ESB standards. These works along with the previously granted car park and berm Reg. Ref. 12/75 will be undertaken to form part of Glanbia’s commitment to improve on going site facilities and are programmed to be complete during 2014. A Natura Impact Statement has been submitted with this application for development
construction of a blow moulding, plastic bottle manufacturing plant, incorporating a direct, covered, conveyor bridge link to the existing Glanbia Dairy, a sprinkler tank, pump house and three number storage silos. Total floor area of this development 2922sqm. Natura Impact Statement submitted with application
Milk Processing Facility at Dublin Road Ballitore Co. Kildare.
Of: (1) Refrigeration plant east of the existing Agri Business store, consisting of a chiller room (59sqm x 4.5m high), a refrigeration process tank (4.5m high) with associated pump equipment, a 2m high wall surrounding part of the plant area and a 6.6m high platform above the chiller room with 2 No. 4.8m high chiller condensers and associated pipework. (2) Retention of existing 9m high chilled water pipebridge linking the existing milk processing plant to the refrigeration platform. (3) Retention of a 2.1m high wall to the rear of the existing car park