Planning Application: 2370 (Kildare County Council )
File Number:
2370
Application Type:
RETENTION
Planning Status:
APPLICATION FINALISED
Received Date:
27/01/2023
Decision Due Date:
29/06/2023
Validated Date:
27/01/2023
Invalidated Date:
Further Info Requested:
21/03/2023
Further Info Received:
02/06/2023
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
29/06/2023
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
Green Generation Ireland Limited,
Applicant Address:
Phone Number:
Fax Number:
24999334
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
the development to be retained consists of 4 No. ancillary structures relating to the operating of the existing biogas facility as follows: (1) Biofilter (part completed); (2) Extension to the Pasteurising Enclosure to enclose the Augmented Digestate Heating Recirculating System; (3) Fire water tank; (4) Feed tank with bund and all associated site works
Development Address:
Gorteen Lower,, Nurney,, Co. Kildare.
Architect Name:
Michael McEniry, NRGE Ltd.
Location Key:
Gorteen Lower, Nurney
Electoral Division:
Planner:
Neil Butler
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
29/06/2023
Manager Order:
DO47773
Decision Type:
Conditional
Number of Conditions:
5
Grant Date:
18/08/2023
Grant Managers Order #:
DO47773
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
17/08/2028
Decision Description:
the development to be retained consists of 4 No. ancillary structures relating to the operating of the existing biogas facility as follows: (1) Biofilter (part completed); (2) Extension to the Pasteurising Enclosure to enclose the Augmented Digestate Heating Recirculating System; (3) Fire water tank; (4) Feed tank with bund and all associated site works
Extension of Duration of 06/2950 - Construct a New Dry Sow house, 2 No Farrowing Rooms, extension to 3 no. Weaner Houses in compliance with Welfare Regulations. Also for the revision and location of the type and location of Tanks, engineered storage basin and shed for a Biogas Plant to process pig manure and other organic material to produce renewable energy and fertilizer previously granted under planning permission 03/734
to modify a permitted biogas facility so as to render it more efficient and compatible with Department of Agriculture, Food and Marine requirements. Retention Permission is soubht for 1. The reorientation and increase in size of the permitted reception building. 2. The relocation of permitted structures (plant room, pasteurizing tank, fuels tank, CHP facility and switch room) from inside the reception building to an external location at the end of the process. 3. The fibre store building in its entirety (including extension to permitted building). 4. Relocation of the permitted manure storage basin. Permission is also sought to modify the biogas facility originally permitted under Reg Ref 06/2950 (extended by 3 years under Reg. Ref. 13/12) and subsequently modified under Reg. Ref. 09/1058 and Reg Ref 10/846 as follows. 1. Relocate the permitted primary digester and the secondary digester at a 90 degree angle to the permitted location. 2. Relocate the permitted plant room from inside the reception building to a location between the two primary digesters. 3. Construct new manure stoage basin adjacent to the existing manure storage basin. 4. Construct a second primary digester tank. 5. Construct an office building. 6. Complete the construction of the reception building. 7. Erect a pasteurization enclosure. The application does not involve any increase in the tonnage of feedstock from that already permitted by the Council under previous permissions. This development comprises of an activity in relation to which a licence under Part IV of the Environmental Protection Agency Act 1992 as amended by the Protection of the Environment Act 2003 is required
new ancillary structures relating to the operating of the existing biogas facility as follows: 1. Biofilter & Air Scrubber (including exhaust stack affixed to existing reception building at max. height of 14m above ground level). 2. LPG Tanks Compound. 3. Enclosed Flare. 4. Provision of 3 No. Storage Digestors with gas storage domes (max. height c.13m). 5. Biogas Upgrader (including Absorption Column 15.257m and a Stripper Column 12.8m). 6. Compressor. 7. Additional standby CHP 2 Enclosure. 8. LPG Boilers. 9. Carbon Filters. 10. Abstraction Sump. 11. Switch Room. 12. Vertical biofilter. 13. Co2 liquefaction plant (max. height 11.3m). 14. New bund wall around the perimeter of the site (max. 0.5m above ground level. 15. Attenuation Tank and all associated site works including decommissioning of existing lagoons and new surface water arrangements. Revised by Significant Further Information
No Environment Impact Assesments Associated with this Application