(a) removal of existing pitch roof over the single storey garage projection, (b) two storey extension to front (south east) elevation, side (north east) elevation and rear (north west) elevation over the existing single storey garage, (c) alterations to existing front (south east) elevation consisting of removal of existing porch roof and replaced with sheet metal flat roof, and new gable roof over existing bay window and to plaster over the existing brick façade with a render finish, (d) single storey extension to rear (north west) elevation, (e) alteration to existing window fenestration on all elevations and minor internal alterations within the existing house
(a) Erection of a two storey office/laboratories building with reception entrance area, staff toilets, shower room with goods-in delivery area and storage on ground floor with managers office and staff canteen facilities and staff toilets on first floor. (b) the installation of new foul sewer and surface water sewer and connection into the existing Millennium Park drainage system and connection into the existing watermains. (c) Permission is also sought for 27 surface car parking spaces with 3 E car charging points, 20 covered cycle parking spaces, delivery area and turning area on south east elevation and (d) Permissions to extend the existing distributor road consisting of new vehicular access road with footpath on both sides and Cycle lane and all site drainage/site development works
(a) Erection of a two storey office/laboratories building with reception entrance area, staff toilets, shower room with goods-in delivery area and storage on ground floor with managers office and staff canteen facilities and staff toilets on first floor. (b) The installation of new foul sewer and surface water sewer and connection into the existing Millennium Park drainage system and connection into the existing water mains. (c) Permission is also sought for 27 surface car parking spaces including 4 E-Car charging points, 20 covered cycle parking spaces, delivery area and turning area on south east elevation and all site drainage/site development works
No Environment Impact Assesments Associated with this Application