Circle K Kill South Service Station N7 ( Southbound carriageway) Boherphilip, Kill,
A high power electric vehicle charging station consisting of the : (1) installation of 6 no. electric vehicle charging bays, each comprising a parking space and electric v (2) associated revisions to existing car parking area.(3) installation of electric vehicle power units. (4) construction of a new substation. (5) erection of illuminated signage. (6) all associated lighting, infrastructure , site and development works.
Circle K Service Station, Southbound carriageway of the N7 Naas Road, Kill,
sought for: (i) An extension (61.4 sqm) to the service station amenity building to accommodate 2 No. new food offers and revised seating, circulation, customer toilets, storage, and staff areas, resulting in a net retail floor area of 100 sqm and an overall floor area of 326.6 sqm. (ii) Elevational changes to building including new canopy, relocated signage, new entrance doors and glazing. (iii) Associated revisions to the site layout incorporating a modified western site entrance, 8 No. new car parking spaces including 2 No. disabled spaces. (iv) All associated drainage works and other site development works
Circle K Service Station, Southbound carriageway of the N7, Naas Road,
(i) A 61.4sqm extension to the existing service station amenity building to accommodate a new food offer and revised seating, circulation, customer toilets, storage, staff areas, resulting in a net retail floor area of 87sqm and an overall floor area of 330.8sqm; (ii) Elevational changes to building including new canopy, new and relocated signage, new entrance and exit doors, a pay hatch and new glazing; (iii) Revisions to the site layout incorporating a modified western site entrance area, 8 no. new car parking spaces, including 2 no. disable spaces, new bicycle parking area comprising 6 no. spaces and new signage at eastern entrance; (iv) The construction of 2 no. refuse areas in southwest corner with 2100mm high timber fencing surrounding; (v) All associated drainage and other site development works
No Environment Impact Assesments Associated with this Application