File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
17489 |
APPLICATION FINALISED |
PERMISSION |
C |
28/04/2017 Friday |
|
Unit H7 Maynooth Business Campus, Maynooth, Co. Kildare. |
(i) Change of use from light industrial to offices; (ii) Provision of new 233sqm internal mezzanine floor; (iii) Alterations to external facade by replacing existing brick finish and roller shutter doors at ground floor level, with new glazed curtain walling and (iv) provision of mechanical plant to roof area |
18169 |
APPLICATION FINALISED |
PERMISSION |
C |
20/02/2018 Tuesday |
|
Unit K8, Maynooth Business Campus, Maynooth, Co. Kildare. |
(i) Change of use from light industrial to offices; (ii) Extension of the internal floor area by provision of a new 580sqm internal mezzanine floor; (iii) Alterations to external facade by replacing existing brick finish, insulated metal panels and roller shutter doors, with new glazed curtain walling; (iv) Provision of mechanical plant to the roof area |
181382 |
APPLICATION FINALISED |
PERMISSION |
C |
15/11/2018 Thursday |
Jomaijo Trading Ltd. |
M4 Motorway to the north, Ballygoran Road to the south Maynooth Business Campus to the west & east off R406 Straffan Road, |
The proposed development will consist of the construction of 1 no. 3 and 4 storey office building consisting of 2 no. blocks with a central glazed atrium area and a screened plant area, solar panels and equipment at roof level, providing a total GFA of 12,641m2. The proposed road infrastructure, and site services as per the previously approved ref. ref 99/2073. Minor amendments to reg. ref. 99/2073 to include rearrangement of previously approved parking, the addition of 12 no. total car parking spaces, 200 no. cycles parking spaces, landscaping consisting of new tree planting, and grass planting, public lighting, and footpaths, ESB substation and switch room, and all associated site and infrastructural works. Revised by significant further information consisting of: Provision of a basement level car park (131 no spaces), access ramp and consequent revisions to the ground floor layout, site layout plans and minor amendments to the rear elevation. |
22686 |
APPLICATION FINALISED |
PERMISSION |
C |
03/06/2022 Friday |
Jomaijo Trading Ltd |
Maynooth Business Campus R406 Straffan Road Maynooth |
development of this c0.708ha site at Maynooth Business Campus Development (Prev approved Reg Ref 99/2073), bounded by the M4 motorway to the north, Ballygoran Road to the south, existing Blocks A, B and C Maynooth Business Campus to the west and existing Block F to the east, existing access off the R406 Straffan Road, Maynooth, Co Kildare. The proposed development will consist a 4-storey office development with a setback top floor over basement car park providing for a GIFA of 12,656m2 excluding basement. The building is subdivisible into 4 office units, Units D1, D2, E1 and E2. The development is to be constructed in 2 phases, Phase 1 includes Block D1 and D2, Phase 2 includes Block E1 and E2. There are an additional 175 car parking spaces proposed (in addition to the previous allocation of 200 spaces for Block D and E under Reg Ref 99/2073), 127 of which are at basement level and 48 are at surface level. There are 253 bicycle spaces proposed in addition to an ESB substation and switch rooms, 2 no plant rooms at roof level, minor revisions to previously approved site and all associated site works above and below ground. (Planning permission was granted for a previously approved office development on this site under ABP-304658-19 – KCC 18/1382) |
221287 |
APPLICATION FINALISED |
RETENTION |
C |
28/10/2022 Friday |
|
Unit K8, Maynooth Business Campus, Maynooth, Co. Kildare |
(1) North Facades, ground & first floors: altered grey brick, altered roller shutter, altered glazed doors, new windows, altered window, new ventilation opes & grills, (2) South Facade, ground floor: new glazed door, new ventilation opes & grills, (3) East Facade, ground & first floor: altered grey brick, new glazed door, (4) New external plant area and footpath to north side, with all associated site works |