Planning application details ref: 21887 Laois County Council

100%100% Complete (warning)

Planning Application: 21887 (Laois County Council )
File Number: 21887
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 17/12/2021 Decision Due Date: 03/11/2022
Validated Date: 17/12/2021 Invalidated Date:
Further Info Requested: 15/02/2022 Further Info Received: 07/10/2022
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 02/11/2022
Leave to Appeal: Appeal Date: 29/11/2022
Commenced Date: Submissions By:

Applicant Details

Applicant name: Salzagold Limited
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: develop as follows on lands at Graiguecullen, Carlow, Co. Laois. The lands are bound to the north by Fruithill Manor and the Castlecomer Road, to the east by Tommy Murphy Park and Springhill Court, undeveloped lands to the south and the Carlow Northern Relief Road Extension to the west. The development will consist of the construction of a mixed use development including housing, nursing home and creche on a site of 9.1 lha, with vehicular access from the existing entrance off the Carlow Northern Relief Road Extension including:- • Land restitution works including removal of unused house foundations, roads and associated services from previously uncompleted development; • Construction of 214 no. residential units consisting of 190 no. houses and 24 no. apartments; •The 190 no. houses will comprise 2-2.5 storey detached, semi-detached and terraced units to include:- 128 no. 3-bed units; 46 no. 3-bed plus study-room units; 16 no. 4-bed plus bedroom/study-room units; • The 24 no. apartments with associated balconies are located across 8 no. 3-storey blocks and consist of the following:- 2 no. 1-bed apartments; 20 no. 2-bed apartments (including 6 no. duplexes); 2 no. 3-bed apartments; • A 2-storey nursing home (5358m2) with 119 no. bedrooms, 2 no. enclosed courtyards and ancillary resident and staff facilities; •A single-storey creche (272.4m2); • Car parking, bicycle parking, internal roads, services infrastructure and bin stores; •Cycle and pedestrian access to the Castlecomer Road to the north; •Pumping station, landscaping, open spaces, children's play areas, boundary treatments and public lighting; • Upsizing the hydro-brake and adding a flow control device to existing surface water management infrastructure to the west of the Carlow Northern Relief Road Extension; •All associated site works and services.
Development Address: Graiguecullen, Carlow, Co. Laois
Architect Name: Barry Kelly Location Key: GRAIGUE CARLOW
Electoral Division: Planner: Emma Hennessy
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 02/11/2022 Manager Order: 731
Decision Type: Conditional Number of Conditions: 25
Grant Date: 24/01/2024 Grant Managers Order #:
Section 47 Apply?: Yes Part 5 Apply?: Yes
Expiry Date: 23/01/2029
Decision Description: develop as follows on lands at Graiguecullen, Carlow, Co. Laois. The lands are bound to the north by Fruithill Manor and the Castlecomer Road, to the east by Tommy Murphy Park and Springhill Court, undeveloped lands to the south and the Carlow Northern Relief Road Extension to the west. The development will consist of the construction of a mixed use development including housing, nursing home and creche on a site of 9.1 lha, with vehicular access from the existing entrance off the Carlow Northern Relief Road Extension including:- • Land restitution works including removal of unused house foundations, roads and associated services from previously uncompleted development; • Construction of 214 no. residential units consisting of 190 no. houses and 24 no. apartments; •The 190 no. houses will comprise 2-2.5 storey detached, semi-detached and terraced units to include:- 128 no. 3-bed units; 46 no. 3-bed plus study-room units; 16 no. 4-bed plus bedroom/study-room units; • The 24 no. apartments with associated balconies are located across 8 no. 3-storey blocks and consist of the following:- 2 no. 1-bed apartments; 20 no. 2-bed apartments (including 6 no. duplexes); 2 no. 3-bed apartments; • A 2-storey nursing home (5358m2) with 119 no. bedrooms, 2 no. enclosed courtyards and ancillary resident and staff facilities; •A single-storey creche (272.4m2); • Car parking, bicycle parking, internal roads, services infrastructure and bin stores; •Cycle and pedestrian access to the Castlecomer Road to the north; •Pumping station, landscaping, open spaces, children's play areas, boundary treatments and public lighting; • Upsizing the hydro-brake and adding a flow control device to existing surface water management infrastructure to the west of the Carlow Northern Relief Road Extension; •All associated site works and services.

Appeal Details


Appeal Details
Notification Date: 30/11/2022 BP Reference #: ABP-315227-22
Appeal Type: THIRD PARTY File Forward Date:
Submission Due Date: 05/01/2023 Submission Sent Date:
Appeal Decision: WITHDRAWN Decision Date:
Withdrawn Date: 17/01/2024 Dismissed Date:
Reason: 2 appeals withdrawn