Planning application details ref: 2460593 Laois County Council

100%100% Complete (warning)

Planning Application: 2460593 (Laois County Council )
File Number: 2460593
Application Type: PERMISSION Planning Status: APPEALED
Received Date: 08/10/2024 Decision Due Date: 02/12/2024
Validated Date: 08/10/2024 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 02/12/2024
Leave to Appeal: Appeal Date: 06/01/2025
Commenced Date: Submissions By: 11/11/2024

Applicant Details

Applicant name: EirGrid plc.
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: refurbish existing 43 no. electricity transmission towers along a c. 7.3 km section (length) of the Coolnabacky – Portlaoise 110 kV overhead line (OHL). The total area to which the application relates is c.37 hectares. The development will consist of refurbishment works to the OHL. Refurbishment works will vary from each of the existing 43 no. existing electricity transmission towers and will comprise: (i) Replacement (“restringing”) of the existing overhead line conductor wires with a higher capacity conductor; (ii) Installation of a new fibre communication connection between existing wooden intermediate poleset (IMP) 118 to existing angle mast (AM) 145; (iii) Strengthening of 4 no. existing AMs and associated foundations; (iv) Replacement of 26 of the 37 no. existing IMPs with similar structures, except for existing IMP105 to be upgraded to AM (AM105). Replacements will be in situ or if required, immediately adjacent, and height will range from c. 0m to 2.7m higher, with no change in height in 19 no. existing IMPs and a maximal increase of c. 2.7m at existing IMP127; (v) Replacement of 1 no. AM (AM145) with a Line Cable Interface Mast (LCIM) and removal of 1 no. AM (AM146); (vi) Replacement of crossarms at 12 no. existing IMPs; (vii) Replacement of insulating and ancillary hardware at structures; (viii) All associated site development works along the overhead line including vegetation clearance and management, disassembly and reassembly of gate posts/piers and removal and reinstatement of existing fencing, painting, installation of identification and information labels/notices, and ancillary works within the existing Portlaoise substation, necessary to facilitate the refurbishment works of the overhead line; and, (ix) Other temporary associated and ancillary site development works required for the proposed refurbishment works including the provision of a construction compound located at either Kylekiproe or Esker, access routes, silt traps, silt fences, stone tracks, ground protection mats, infrastructure crossing support systems (e.g., guard poles and goal posts) and temporary watercourse crossings. Where required, an aerial catenary stringing system (ACSS) will be used to facilitate stringing operations over major obstacles (e.g., national roads, rivers, etc.). The planning application will be accompanied by a Natura Impact Statement.
Development Address: Meelick, Money Upper, Rathleague, Hophall, Ballymooney, Money Lower, Dysart, Lamberton Demesne, Derry, Clonminam, Powelstown, Kylekiproe and Cappoley, and Esker., Co. Laois, N/A
Architect Name: Location Key: MEELICK (PART OF) PORTLAOISE RURAL
Electoral Division: Planner: Emma Hennessy
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 02/12/2024 Manager Order: 756
Decision Type: Conditional Number of Conditions: 13
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date:
Decision Description: refurbish existing 43 no. electricity transmission towers along a c. 7.3 km section (length) of the Coolnabacky – Portlaoise 110 kV overhead line (OHL). The total area to which the application relates is c.37 hectares. The development will consist of refurbishment works to the OHL. Refurbishment works will vary from each of the existing 43 no. existing electricity transmission towers and will comprise: (i) Replacement (“restringing”) of the existing overhead line conductor wires with a higher capacity conductor; (ii) Installation of a new fibre communication connection between existing wooden intermediate poleset (IMP) 118 to existing angle mast (AM) 145; (iii) Strengthening of 4 no. existing AMs and associated foundations; (iv) Replacement of 26 of the 37 no. existing IMPs with similar structures, except for existing IMP105 to be upgraded to AM (AM105). Replacements will be in situ or if required, immediately adjacent, and height will range from c. 0m to 2.7m higher, with no change in height in 19 no. existing IMPs and a maximal increase of c. 2.7m at existing IMP127; (v) Replacement of 1 no. AM (AM145) with a Line Cable Interface Mast (LCIM) and removal of 1 no. AM (AM146); (vi) Replacement of crossarms at 12 no. existing IMPs; (vii) Replacement of insulating and ancillary hardware at structures; (viii) All associated site development works along the overhead line including vegetation clearance and management, disassembly and reassembly of gate posts/piers and removal and reinstatement of existing fencing, painting, installation of identification and information labels/notices, and ancillary works within the existing Portlaoise substation, necessary to facilitate the refurbishment works of the overhead line; and, (ix) Other temporary associated and ancillary site development works required for the proposed refurbishment works including the provision of a construction compound located at either Kylekiproe or Esker, access routes, silt traps, silt fences, stone tracks, ground protection mats, infrastructure crossing support systems (e.g., guard poles and goal posts) and temporary watercourse crossings. Where required, an aerial catenary stringing system (ACSS) will be used to facilitate stringing operations over major obstacles (e.g., national roads, rivers, etc.). The planning application will be accompanied by a Natura Impact Statement.

Appeal Details


Appeal Details
Notification Date: 08/01/2025 BP Reference #: ABP-321599-25
Appeal Type: THIRD PARTY File Forward Date:
Submission Due Date: 04/02/2025 Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: