Planning Application: 2157 (Leitrim County Council )
File Number:
2157
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
29/03/2021
Decision Due Date:
03/02/2022
Validated Date:
29/03/2021
Invalidated Date:
Further Info Requested:
21/05/2021
Further Info Received:
01/12/2021
Withdrawn Date:
Extend Date:
Decision Type:
Refused
Decision Date:
02/02/2022
Leave to Appeal:
Appeal Date:
01/03/2022
Commenced Date:
Submissions By:
13/01/2022
Applicant Details
Applicant name:
Tullynamoyle Wind Farm 5 Ltd
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
a ten-year planning permission and a thirty- year operational life, from the date of commissioning, for an additional four (4) wind turbines to the nineteen (19) turbine Tullynamoyle windfarm (15 existing turbines and 4 consented turbines) in the townlands of Tullinloughan, Lackagh, Tullynamoyle and Gowlaun, County Leitrim. An underground grid connection to Corderry Substation will be located in the townlands of Tullinwannia, Tullynasharragh, Gubaderry, Tullinwillin, Gortahork, Mullaghmore, Leamaskally, Cornmarve, Drumlumman Glebe, Drumillion, Drumany Glebe, Belhavel, Corrasra and Corderry, Killarga, County Leitrim.The proposed development will constitute the provision of the following: 1. The construction of four (4) wind turbines with maximum hub heights of 92 metres and maximum overall heights of 155 metres to blade tip. 2. The construction of crane hardstand areas located beside each turbine. 3. The construction of one (1) 20kv substation building, 2 No. container units and associated electrical plant for grid stabilisation. 4. Internal windfarm underground cabling including one stream-crossing by overhead line. 5. The construction of new site access tracks and the provision of upgraded access roads. 6. Installation of a drainage system for the proposed hardstand and road areas. 7. Underground grid connection to Corderry 110kv substation, approximately 9.5km in length, along the existing public road network. 8. All associated site development and ancillary works. The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and by a Natura Impact Statement.
Development Address:
Townlands as above.
Architect Name:
Brian Doyle
Location Key:
TULLYNAMOYLE, KILLARGA
Electoral Division:
Planner:
Joseph Duffy
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
02/02/2022
Manager Order:
22/CE/51
Decision Type:
Refused
Number of Conditions:
3
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
28/08/2028
Decision Description:
a ten-year planning permission and a thirty- year operational life, from the date of commissioning, for an additional four (4) wind turbines to the nineteen (19) turbine Tullynamoyle windfarm (15 existing turbines and 4 consented turbines) in the townlands of Tullinloughan, Lackagh, Tullynamoyle and Gowlaun, County Leitrim. An underground grid connection to Corderry Substation will be located in the townlands of Tullinwannia, Tullynasharragh, Gubaderry, Tullinwillin, Gortahork, Mullaghmore, Leamaskally, Cornmarve, Drumlumman Glebe, Drumillion, Drumany Glebe, Belhavel, Corrasra and Corderry, Killarga, County Leitrim.The proposed development will constitute the provision of the following: 1. The construction of four (4) wind turbines with maximum hub heights of 92 metres and maximum overall heights of 155 metres to blade tip. 2. The construction of crane hardstand areas located beside each turbine. 3. The construction of one (1) 20kv substation building, 2 No. container units and associated electrical plant for grid stabilisation. 4. Internal windfarm underground cabling including one stream-crossing by overhead line. 5. The construction of new site access tracks and the provision of upgraded access roads. 6. Installation of a drainage system for the proposed hardstand and road areas. 7. Underground grid connection to Corderry 110kv substation, approximately 9.5km in length, along the existing public road network. 8. All associated site development and ancillary works. The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and by a Natura Impact Statement.