Planning application details ref: 2275 Longford County Council

100%100% Complete (warning)

Planning Application: 2275 (Longford County Council)
File Number: 2275
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 01/04/2022 Decision Due Date: 12/12/2022
Validated Date: 01/04/2022 Invalidated Date:
Further Info Requested: 20/05/2022 Further Info Received: 15/11/2022
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 08/12/2022
Leave to Appeal: Appeal Date: 09/01/2023
Commenced Date: Submissions By:

Applicant Details

Applicant name: Electricity Supply Board
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: development at the 13.1 Ha site known as 'Lough Ree Power (LRP) Station' located in Lanesborough (Lanesboro), in the townlands of Aghamore and Lanesborough, Eircode N37E180; in County Longford. The development will consist of the demolition of the existing LRP station (as approved under Longford County Council reg.ref 01/115 ' An Board Pleanala Ref. PL14.125540 and all subsequent permissions);and the development and operation of electricity grid services - namely a battery energy storage system (BESS) and a Synchronous Condenser (Sync Con). The proposed development comprises two distinct phases of activity - the initial demolition and site reinstatement (Phase 1); following by construction and operation of the new BESS and Sync Con (phase 2). Phase 1 comprises the demolition of existing site structures (with a total footprint of c. 11.195sq.m. and a total gross floor area of c. 20,000 sq.m) including the former LRP station (boiler house, turbine house, bag filter house and associated 80 m high stack); the intermediate peat storage building and associated fuel management system; and ancillary buildings including, electrical building, tippler building and associated control room and office, the screening building, lorry uploading building, water treatment plant building, offices building, laboratory building, workshop and maintenance buildings, oil pumphouse, electrics rooms, railway/locomotive service building, cooling water pump house and sewage/foul water treatment facility. All buildings and structures (including storage tanks and vessels) will be demolished to ground level, with below ground voids filled. Existing hard standing surfac3es (e.g. building ground floor concrete slabs, tarmacadam surfaces, concrete footpaths and road kerbs) will remain in site; and the site will be reinstated and secured with boundary gates and fences, etc. Associated with the demolition activity there will be on-site crushing of material using mobile machinery for the purposed of disposal and/or material re-use. Phase 2 comprises the proposed development of the BESS, Sync Con; and all associated development (Full description scanned/attached)
Development Address: Aughamore, And Lanesborough, Co Longford
Architect Name: Location Key: AUGHAMORE AND LANESBOROUGH
Electoral Division: Planner: None
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 08/12/2022 Manager Order: 30070
Decision Type: Conditional Number of Conditions: 15
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 12/10/2033
Decision Description: development at the 13.1 Ha site known as 'Lough Ree Power (LRP) Station' located in Lanesborough (Lanesboro), in the townlands of Aghamore and Lanesborough, Eircode N37E180; in County Longford. The development will consist of the demolition of the existing LRP station (as approved under Longford County Council reg.ref 01/115 ' An Board Pleanala Ref. PL14.125540 and all subsequent permissions);and the development and operation of electricity grid services - namely a battery energy storage system (BESS) and a Synchronous Condenser (Sync Con). The proposed development comprises two distinct phases of activity - the initial demolition and site reinstatement (Phase 1); following by construction and operation of the new BESS and Sync Con (phase 2). Phase 1 comprises the demolition of existing site structures (with a total footprint of c. 11.195sq.m. and a total gross floor area of c. 20,000 sq.m) including the former LRP station (boiler house, turbine house, bag filter house and associated 80 m high stack); the intermediate peat storage building and associated fuel management system; and ancillary buildings including, electrical building, tippler building and associated control room and office, the screening building, lorry uploading building, water treatment plant building, offices building, laboratory building, workshop and maintenance buildings, oil pumphouse, electrics rooms, railway/locomotive service building, cooling water pump house and sewage/foul water treatment facility. All buildings and structures (including storage tanks and vessels) will be demolished to ground level, with below ground voids filled. Existing hard standing surfac3es (e.g. building ground floor concrete slabs, tarmacadam surfaces, concrete footpaths and road kerbs) will remain in site; and the site will be reinstated and secured with boundary gates and fences, etc. Associated with the demolition activity there will be on-site crushing of material using mobile machinery for the purposed of disposal and/or material re-use. Phase 2 comprises the proposed development of the BESS, Sync Con; and all associated development (Full description scanned/attached)

Appeal Details


Appeal Details
Notification Date: 09/01/2023 BP Reference #: ABP-315485-22
Appeal Type: THIRD PARTY File Forward Date:
Submission Due Date: 05/02/2023 Submission Sent Date:
Appeal Decision: CONDITIONAL Decision Date: 13/10/2023
Withdrawn Date: Dismissed Date:
Reason: Upheld Council's Decision