Permission for development of topsoil stripping and placement into perimeter berms with perimeter fencing, also stone surfacing of an area of approximately 2.0 hectacres for open storage of port cargoes such as reinforcing steel and mesh. A Natura Impact Statement has been prepared in support of this application. **Significant Further Information received 08/12/2015**
Permission for development will consist of an open storage area of approximately 1.4 hectares (for the storage of steel and port related cargoes) and a new left-in only entrance off the R175 to serve the proposed open storage area and adjacent open storage areas. The proposed works will comprise two stages, namely, (1) stripping of topsoil (c. 200mm) & construction of a berm (minimum 2000mm) along the eastern and western boundaries and the construction of the new left-in only entrance and (2) other ancillary site development works including hard surfacing (maximum depth 400mm), lighting and landscape works. **SIGNIFICANT FURTHER INFORMATION RECEIVED 22/08/2018 which provides for, inter alia, the submission of a Natura Impact Statement**
No Environment Impact Assesments Associated with this Application