EXTENSION OF DURATION for Residential Development permitted under Reference 10/174 (ABP PL15.238053) consisting of Permission for a 10 year permission for a development consisting of (i) a public park (4.91ha) including play areas & a MUGA (Multi Use Games Area), (ii) a total of 281 residential dwellings (14 no. apartments, 34 no. duplex type dwellings, 83 no. terrace dwellings, 72 no. semi-detached dwellings, 78 no. detached dwellings) ranging in height from 1-4 storeys (including split-level / semi-basement units) with solar panels & with balconies to serve apartment / duplex units (iii) A single storey community building (167m²), (iv) a three storey neighbourhood centre incorporating 2 no. retail units & 1 no. unit for sale of hot food for consumption off the premises at ground floor level (ground floor has gross floor area of 290m²), with associated signage & with duplex dwellings at first & second floor level; (v) construction of a section of new Local Collector Road (c.600m in length), (vi) 503 no. car parking spaces & 54 no. cycle parking spaces, (vii) Bring bank re-cycling facility, (viii) landscaping works to include the provision of local & neighbourhood open space areas, planting & augmentation of existing boundary hedgerows, (ix) new road junction access off Drogheda road (N2) including provision of nearside passing option, pedestrian refuge islands & road signage, (x) 5 no. ESB sub stations (xi) All associated site development works including construction of roads, cycle routes & pedestrian walkways, partial re-alignment & culverting of existing watercourse which bisects the application site, re-routing of existing water pipelines to/from the town reservoir located at the summit of Mulladrillen Hill & which traverse the application site, & provision of new water supply system, foul water drainage systems including connection in to the existing system on the N2 & on the access road in De La Salle Crescent Housing Estate, surface water drainage system including discharge (after attenuation) to the existing watercourses through & around the perimeter of the site, boundary treatments, public lighting, alterations to site levels & construction of retaining walls on a site extending to 19 hectares. A Master Plan pertaining to an area extending to 27.8 hectares & incorporating the application site accompanies the application. An Environmental Impact Statement (EIS) will be submitted to the Planning Authority with this application.
Bridgegate, Rathgory, Mulladrillen Drogheda Road Ardee, Co Louth
SHD Stage 3 Decision made by ABP (ABP-313083-22) Stage 2 Ref. No. 20/759 - See www.bridgegateshd.ie for details. The Ardee Partnership, intend to apply to An Bord Pleanála for permission. development will consist of:A) construction of 272 no. residential units comprising 206 houses 66 no. duplex units (3 storeys), with private open space, B) A part 1, part 2 no. storey crèche and playground and a single storey community building adjacent at a community hubaccessed from Bridgegate Avenue served by car parking on Bridgegate Green and Bridgegate Avenue;C) A Park located in the northof the site extending to accessed from community hub and between duplex B & C at Bridgegate Avenue, with 2 no. pedestrian links to public park adjoining to the west and 1 no. pedestrian footpathextending to the north perimeter at Hale Street, with reservation for a future link road to the east facilitated in the north section of park;D) Works to the Rathgory Tributary comprising realignment of the channel and regrading and reprofiling of land, implementation of 2 vehicular crossings and provision of a riparian corridor based around the open watercourse comprising landscaping and planting with access to the watercourse provided for maintenance purposes and 1 no. pedestrian and cyclist crossing; E) A series of public open spaces; open spaces will provide a mix of hard and soft landscaping, pedestrian and cycle access and a range of activities F) Provision of shared surfaces, landscaped streetscapes including planting and landscaping at two neighbourhood streets in the southern part of the site, with roads provided to site boundaries to the east, south and west to facilitate possible future connections; G) All landscaping and boundary treatments;H) Roads and access infrastructure taken from Bridgegate Avenue (permitted Ref: 10/174; ABP Ref: PL15.238053, provision of a bus stop on the south side of Bridgegate Avenue adjacent to community hub and provision of cycle lanes at thislocation (continued through Public Open Space 01); a total of 480 no. car parking spaces (362 no. serving houses, 84 no. serving duplexes, 23 no. serving crèche and community building and 11 no. visitor and public open spaces), a total of 296 no. bicycle parking spaces ;I) Provision of 2 ESB substations, drainage and services infrastructure, lighting, SUDS drainage. An EIAR and a NIS have been prepared
No Environment Impact Assesments Associated with this Application