the construction of multi-operator telecommunications infrastructure comprised of; a 24m lattice tower, antennas, dishes and associated equipment , together with new ground level equipment cabinets
Development Address:
Eir Exchange , Carriage Road, Navan, Co. Meath
Architect Name:
Laura O'Connell
Location Key:
DILLONSLAND (PART OF
Electoral Division:
Incorrect Icl Voter Recor
Planner:
Philip Maguire
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
11/01/2022
Manager Order:
42/22
Decision Type:
Conditional
Number of Conditions:
7
Grant Date:
22/02/2022
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
21/02/2027
Decision Description:
the construction of multi-operator telecommunications infrastructure comprised of; a 24m lattice tower, antennas, dishes and associated equipment , together with new ground level equipment cabinets
for continuance of use for development of existing 3 no. radio aerials (3.9m in length) on the rooftop of the exchange, these will be pole mounted and extended 5.85m above the rooftop for the emergency service users (garda, ambulance, fire brigade) and associated equipment and handrails for the National Digital Radio Service (NRDS)
the construction of 3 no radio aerials (3.9m in length) on the rooftop of the exchange, these will be pole mounted and extend 5.85 m above the rooftop for the emergency service users (garda, ambulance and fire brigade) and associated equipment and handrails for a national digital radio service (NDRS)
No Environment Impact Assesments Associated with this Application