(i) removal of exiting mono pitched roof and the construction of 1 no. additional 3 bedroom apartment with new flat roof and solar panels to second floor, Block D (Woodleigh); (ii) and eternal covered secure Sheffield type bicycle stand for 10 number bicycles at the entrance to Block D (Woodleigh) from Tudor Grove, (iii) 2 No. charging points for electric vehicles and (iv) all associated site works necessary to facilitate the development. The apartment has associated private open space in the form of a private balcony and has access to the existing landscaped communal open spaces on site
Development Address:
Regents Hall, Ashbourne, Co. Meath
Architect Name:
Peter O'Dwyer
Location Key:
KILLEGLAND
Electoral Division:
Incorrect Icl Voter Recor
Planner:
Jennifer McQuaid
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
04/05/2022
Manager Order:
814/22
Decision Type:
Conditional
Number of Conditions:
10
Grant Date:
14/06/2022
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
13/06/2027
Decision Description:
(i) removal of exiting mono pitched roof and the construction of 1 no. additional 3 bedroom apartment with new flat roof and solar panels to second floor, Block D (Woodleigh); (ii) and eternal covered secure Sheffield type bicycle stand for 10 number bicycles at the entrance to Block D (Woodleigh) from Tudor Grove, (iii) 2 No. charging points for electric vehicles and (iv) all associated site works necessary to facilitate the development. The apartment has associated private open space in the form of a private balcony and has access to the existing landscaped communal open spaces on site
the development will consist of (i) the construction of 1 no. 5 storey apartment block providing a total of 35 no. two-bed residential apartment units; (ii) increase of the 7 no. surface carparking to 10 no. car parking spaces; (iii) 35 no. bicycle spaces; (iv) a refuse storage area and (v) all associated site works which include; the installation of an ESB substation and switch room; internal hard landscaping including footpaths; and all engineering and site works necessary to facilitate the development. Each apartment has associated private open space in the form of a private balcony and has access to a landscaped communal open space to the North of the proposed building. Significant further information/revised plans submitted on this application
No Environment Impact Assesments Associated with this Application