Planning application details ref: 22653 Meath CoCo

100%100% Complete (warning)

Planning Application: 22653 (Meath CoCo)
File Number: 22653
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 19/05/2022 Decision Due Date: 29/11/2022
Validated Date: 19/05/2022 Invalidated Date:
Further Info Requested: 11/07/2022 Further Info Received: 20/09/2022
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 28/11/2022
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By: 08/11/2022

Applicant Details

Applicant name: Foxtrot Investments 2011 Limited,
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: a pedestrian/cycle bridge crossing the River Blackwater extending to c. 93.6 metres in length. The bridge will provide for a shared pedestrian and cycle access (4 metres wide) extending from permitted footpath and cycle infrastructure at Balmoral Industrial Estate at the southern part of the site, spanning the watercourse and connecting to existing pedestrian and cycle network in the Blackwater Public Park, on the northern side of the site. The proposal will include safety balustrades and lighting, all infrastructure, landscaping, access and associated site development works to enable the development. A Natura Impact Statement will be submitted to the planning authority with the application. Significant further information/revised plans submitted on this application
Development Address: Balmoral Industrial Estate & Blackwater Park, Navan, Co Meath
Architect Name: Location Key: NAVAN TOWN
Electoral Division: Incorrect Icl Voter Recor Planner: Jennifer McQuaid
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments: "Application contains Natura Impact Statement (NIS) not EIA(R)"

Decision

Decision Date: 28/11/2022 Manager Order: 1996/22
Decision Type: Conditional Number of Conditions: 8
Grant Date: 20/01/2023 Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 19/01/2028
Decision Description: a pedestrian/cycle bridge crossing the River Blackwater extending to c. 93.6 metres in length. The bridge will provide for a shared pedestrian and cycle access (4 metres wide) extending from permitted footpath and cycle infrastructure at Balmoral Industrial Estate at the southern part of the site, spanning the watercourse and connecting to existing pedestrian and cycle network in the Blackwater Public Park, on the northern side of the site. The proposal will include safety balustrades and lighting, all infrastructure, landscaping, access and associated site development works to enable the development. A Natura Impact Statement will be submitted to the planning authority with the application. Significant further information/revised plans submitted on this application

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: