the proposal involves the construction of a water treatment plant and ancillary infrastructure within the mine site complex. The water treatment plant will augment the extant water management/ treatment system at the mine site. The proposed development will extend to c. 550m2 and will not exceed 5.5m above ground level (53m AOD). The proposed development relates to an activity covered by the Company's Industrial Emissions Licence Ref. No. P0 516-04. A Natura Impact Impact Statement (NIS) for the development has been prepared and will be submitted to the Planning Authority with the planning application
Development Address:
Knockumber , Navan, Co. Meath
Architect Name:
Location Key:
KNOCKUMBER
Electoral Division:
Incorrect Icl Voter Recor
Planner:
Frank O'Donnell
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
23/05/2023
Manager Order:
751/23
Decision Type:
Conditional
Number of Conditions:
3
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
19/01/2030
Decision Description:
the proposal involves the construction of a water treatment plant and ancillary infrastructure within the mine site complex. The water treatment plant will augment the extant water management/ treatment system at the mine site. The proposed development will extend to c. 550m2 and will not exceed 5.5m above ground level (53m AOD). The proposed development relates to an activity covered by the Company's Industrial Emissions Licence Ref. No. P0 516-04. A Natura Impact Impact Statement (NIS) for the development has been prepared and will be submitted to the Planning Authority with the planning application
a ten-year planning permission for a solar energy development with a total site area of approximately 34 hectares comprising (i) photovoltaic solar panels on steel mounting frames; (ii) electrical inverters; (iii) electrical power stations; (iv) an electrical control building and associated electrical apparatus; (v) underground electrical and communications cabling; (vi) on-site access tracks; (vii) a temporary construction compound; (viii) security fencing and security gates; (ix) pole-mounted security cameras; and (x) all associated and ancillary site development, landscaping and reinstatement works. The operational lifetime of the proposed development is 35-years. This development is related to an activity requiring an Industrial Emissions Licence. This planning application is accompanied by an Environmental Impact Assessment Screening Report and a Natura Impact Statement
to vertically extend its existing tailings facility of approx. 150 hectares in the townlands of Randalstown, Simonstown and Silogue, Co. Meath for the purpose of extending the life of its mine and to develop and operate two borrow areas of 52 hectare
Randalstown Simonstown and Siloge Navan, Co Meath.
the stage 5 development, will consist of a 4 metre vertical extension delivering an additional 5.6 million cubic metres of storage capacity. The stage 5 development is for the purpose of extending the life of the mine and will be constructed on the footprint of the existing facility, which occupies an area of 170 hectares. The glacial till material to be used in construction of the vertical extension will come from two immediately adjacent areas of 52 hectares and 18 hectares located in the townland of Randalstown. Planning permission for the 52 hectare area was granted in the previous stage 4 development, ref. No. 96/919. An environmental inpact statement (EIS) has been prepared and will accompany the planning application. This proposal will require a revision of the company's integrated pollution prevention control license (IPPCL No. P0516-01) by the environmental protection agency (EPA). The development is a vertical extension to the existing tailings storage facility. Significant further information/revised plans submitted for this application