The development will consist of: i. Construction of 3 no. office buildings with a cumulative gross floor area (GFA) of 13,729 sq.m ranging in height from 3 to 4- storeys and shall comprise the following: a. Building 1 (3,597 sq.m GFA) 3-storeys in height (12.35 metres to top of parapet), with a set back louvred screen 2m above parapet level. b. Building 2 (5,336 sq.m GFA) 4-storeys in height (16.125 metres to top of parapet), with a set back louvred screen 2m above parapet level. c. Building 3 (4,796 sq.m GFA) 4-storeys in height (16.125 metres to top of parapet), with a set back louvred screen 2m above parapet level. ii. Roof mounted solar PV panels (c. 180 sq.m combined area); iii. Provision of a 4-arm signalised junction replacing the existing Pace roundabout to include a new northern arm with segregated cycleway and footpath; iv. Access to the development is proposed from the new northern arm, with 6m wide internal access roads to serve the development; v. Upgrade works to the R157 and M3 Parkway access road to facilitate junction improvements; vi. A total of 275 surface car parking spaces including 14 disabled access bays and 55 electric car charging points; vii. 280 bicycle parking spaces in 3 secure cycle storage areas adjacent to the buildings; viii. Site signage is to be erected, all spot-lit and back-lit illuminated, including 2 no. type 1 entrance signs (6.15m x 2.4m) and 3 no. type 2 building signs (1.35m x 2.4m); ix. 3 standalone electricity substations; x. Foul sewer connection to existing public system including pumping station on site with rising mains along Kennedy Road and Navan Road; xi. Watermain connection to the north east of site at Pace for connection to Irish Water Infrastructure; xii. Permission is also sought for associated landscaping, boundary treatments, public lighting, plant, waste storage and all ancillary site and development works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development. Signficant further information/revised plans submitted on this application
Development Address:
Bennetstown , Pace , Dunboyne, Co. Meath
Architect Name:
McCutcheon Halley Chartered
Location Key:
DUNBOYNE
Electoral Division:
Incorrect Icl Voter Recor
Planner:
Jennifer McQuaid
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
APPEAL COND 2 ONLY SO FG ISSUE WITH AMN CONDS.(NIS) not EIA(R)"Agreed to extend FI deadline 17/03/24
Decision
Decision Date:
07/06/2024
Manager Order:
806/24
Decision Type:
Conditional
Number of Conditions:
23
Grant Date:
29/04/2025
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
28/04/2035
Decision Description:
The development will consist of: i. Construction of 3 no. office buildings with a cumulative gross floor area (GFA) of 13,729 sq.m ranging in height from 3 to 4- storeys and shall comprise the following: a. Building 1 (3,597 sq.m GFA) 3-storeys in height (12.35 metres to top of parapet), with a set back louvred screen 2m above parapet level. b. Building 2 (5,336 sq.m GFA) 4-storeys in height (16.125 metres to top of parapet), with a set back louvred screen 2m above parapet level. c. Building 3 (4,796 sq.m GFA) 4-storeys in height (16.125 metres to top of parapet), with a set back louvred screen 2m above parapet level. ii. Roof mounted solar PV panels (c. 180 sq.m combined area); iii. Provision of a 4-arm signalised junction replacing the existing Pace roundabout to include a new northern arm with segregated cycleway and footpath; iv. Access to the development is proposed from the new northern arm, with 6m wide internal access roads to serve the development; v. Upgrade works to the R157 and M3 Parkway access road to facilitate junction improvements; vi. A total of 275 surface car parking spaces including 14 disabled access bays and 55 electric car charging points; vii. 280 bicycle parking spaces in 3 secure cycle storage areas adjacent to the buildings; viii. Site signage is to be erected, all spot-lit and back-lit illuminated, including 2 no. type 1 entrance signs (6.15m x 2.4m) and 3 no. type 2 building signs (1.35m x 2.4m); ix. 3 standalone electricity substations; x. Foul sewer connection to existing public system including pumping station on site with rising mains along Kennedy Road and Navan Road; xi. Watermain connection to the north east of site at Pace for connection to Irish Water Infrastructure; xii. Permission is also sought for associated landscaping, boundary treatments, public lighting, plant, waste storage and all ancillary site and development works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development. Signficant further information/revised plans submitted on this application
south-west of the M3 Parkway and south-east of the Dunboyne Bypass (R157) located in the Townland of Bennetstown, and the balance (1.92ha) located in the Townlands of Pace, Bennetstown and Dunboyne including the Dunboyne Bypass (R157) and M3 Parkway