Planning application details ref: 23424 Meath CoCo

100%100% Complete (warning)

Planning Application: 23424 (Meath CoCo)
File Number: 23424
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 19/04/2023 Decision Due Date: 09/06/2024
Validated Date: 19/04/2023 Invalidated Date:
Further Info Requested: 09/06/2023 Further Info Received: 14/03/2024
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 07/06/2024
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By: 19/05/2024

Applicant Details

Applicant name: McGarrell Reilly Homes
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: The development will consist of: i. Construction of 3 no. office buildings with a cumulative gross floor area (GFA) of 13,729 sq.m ranging in height from 3 to 4- storeys and shall comprise the following: a. Building 1 (3,597 sq.m GFA) 3-storeys in height (12.35 metres to top of parapet), with a set back louvred screen 2m above parapet level. b. Building 2 (5,336 sq.m GFA) 4-storeys in height (16.125 metres to top of parapet), with a set back louvred screen 2m above parapet level. c. Building 3 (4,796 sq.m GFA) 4-storeys in height (16.125 metres to top of parapet), with a set back louvred screen 2m above parapet level. ii. Roof mounted solar PV panels (c. 180 sq.m combined area); iii. Provision of a 4-arm signalised junction replacing the existing Pace roundabout to include a new northern arm with segregated cycleway and footpath; iv. Access to the development is proposed from the new northern arm, with 6m wide internal access roads to serve the development; v. Upgrade works to the R157 and M3 Parkway access road to facilitate junction improvements; vi. A total of 275 surface car parking spaces including 14 disabled access bays and 55 electric car charging points; vii. 280 bicycle parking spaces in 3 secure cycle storage areas adjacent to the buildings; viii. Site signage is to be erected, all spot-lit and back-lit illuminated, including 2 no. type 1 entrance signs (6.15m x 2.4m) and 3 no. type 2 building signs (1.35m x 2.4m); ix. 3 standalone electricity substations; x. Foul sewer connection to existing public system including pumping station on site with rising mains along Kennedy Road and Navan Road; xi. Watermain connection to the north east of site at Pace for connection to Irish Water Infrastructure; xii. Permission is also sought for associated landscaping, boundary treatments, public lighting, plant, waste storage and all ancillary site and development works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development. Signficant further information/revised plans submitted on this application
Development Address: Bennetstown , Pace , Dunboyne, Co. Meath
Architect Name: McCutcheon Halley Chartered Location Key: DUNBOYNE
Electoral Division: Incorrect Icl Voter Recor Planner: Jennifer McQuaid
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments: APPEAL COND 2 ONLY SO FG ISSUE WITH AMN CONDS.(NIS) not EIA(R)"Agreed to extend FI deadline 17/03/24

Decision

Decision Date: 07/06/2024 Manager Order: 806/24
Decision Type: Conditional Number of Conditions: 23
Grant Date: 29/04/2025 Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 28/04/2035
Decision Description: The development will consist of: i. Construction of 3 no. office buildings with a cumulative gross floor area (GFA) of 13,729 sq.m ranging in height from 3 to 4- storeys and shall comprise the following: a. Building 1 (3,597 sq.m GFA) 3-storeys in height (12.35 metres to top of parapet), with a set back louvred screen 2m above parapet level. b. Building 2 (5,336 sq.m GFA) 4-storeys in height (16.125 metres to top of parapet), with a set back louvred screen 2m above parapet level. c. Building 3 (4,796 sq.m GFA) 4-storeys in height (16.125 metres to top of parapet), with a set back louvred screen 2m above parapet level. ii. Roof mounted solar PV panels (c. 180 sq.m combined area); iii. Provision of a 4-arm signalised junction replacing the existing Pace roundabout to include a new northern arm with segregated cycleway and footpath; iv. Access to the development is proposed from the new northern arm, with 6m wide internal access roads to serve the development; v. Upgrade works to the R157 and M3 Parkway access road to facilitate junction improvements; vi. A total of 275 surface car parking spaces including 14 disabled access bays and 55 electric car charging points; vii. 280 bicycle parking spaces in 3 secure cycle storage areas adjacent to the buildings; viii. Site signage is to be erected, all spot-lit and back-lit illuminated, including 2 no. type 1 entrance signs (6.15m x 2.4m) and 3 no. type 2 building signs (1.35m x 2.4m); ix. 3 standalone electricity substations; x. Foul sewer connection to existing public system including pumping station on site with rising mains along Kennedy Road and Navan Road; xi. Watermain connection to the north east of site at Pace for connection to Irish Water Infrastructure; xii. Permission is also sought for associated landscaping, boundary treatments, public lighting, plant, waste storage and all ancillary site and development works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development. Signficant further information/revised plans submitted on this application

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: