to construct a stand alone farm produce store with concrete apron to front & side, use existing entrance & access road together with all works ancillary to the overall development on site
planning permission is sought for - The removal of 8m of piers and walls either side of the existing entrance along the R163; Installation of piers 2.5m from existing piers down the existing avenue/driveway; and construction of a wall to the same height as the current wall which will adjoin the newly proposed piers and the wall along the R163. Retention permission is sought for: - The placing of topsoil berm with an area of 1,102m2 at site perimeter: - The pouring of concrete for the concrete pad with an area of 538m2 and - Placing of crushed rock for the creation of hard stand with an area of 4,581m2. - Retention planning for a lime silo
planning permission is sought for a 664m2 extension to an existing agricultural shed used for storage of sludge/bio-solid fertiliser and the construction of an over ground slurry/industrial sludge storage tank with a capacity of 931m3 and all associated site works as well as permission for alterations to the existing entrance to the facility along the R163. Permission is also sought to amend planning condition 2(a) and 2(b) of planning application PL17.241695. The amendments are, increase of overall tonnage of sludge/bio-solid fertiliser accepted at the facility from 3,000 tonnes per annum to 15,000 tonnes per annum and to allow municipal wastewater treatment plant sludges/biosolids be imported from any County in Ireland. Retention permission is sought for an existing lime silo (Appropriate Assessment Submitted)
No Environment Impact Assesments Associated with this Application